Difference between revisions of "2012 Software Review Planning Meeting: Apr. 27, 2012"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 21: | Line 21: | ||
#** <s>[[Media:20120328_halld_management_structure.pdf|Management Plan]]</s> | #** <s>[[Media:20120328_halld_management_structure.pdf|Management Plan]]</s> | ||
#* <s>April 13:</s> | #* <s>April 13:</s> | ||
− | #** <s> | + | #** <s>How many talks each hall will be presenting in the morning session</s> |
− | #** <s> | + | #** <s>Ideas/suggestion for the parallel session</s> |
#* '''May 1 - talk outlines''' | #* '''May 1 - talk outlines''' | ||
#** [[Media:201204013_morning talks_outline.pdf|Morning Talks]] | #** [[Media:201204013_morning talks_outline.pdf|Morning Talks]] | ||
#** [[Media:20120417_Afternoon_outline.pdf|Afternoon Talk]] | #** [[Media:20120417_Afternoon_outline.pdf|Afternoon Talk]] | ||
− | #* April 30 - Written material for the review ( | + | #* '''April 30 - Written material for the review (See [[April 11,2012 e-mail from Curtis regard RMP for Software Review| Apr. 11 e-mail from Curtis]]).''' |
− | #** [https://halldsvn.jlab.org/repos/trunk/docs/offline/ComputingPlan Computing Plan] | + | #** '''[https://halldsvn.jlab.org/repos/trunk/docs/offline/ComputingPlan Computing Plan]''' |
#* May 14/15 - First draft of presentations for dry run. | #* May 14/15 - First draft of presentations for dry run. | ||
#* May 24/25 or 29/30 - Final talks with timed presentations. | #* May 24/25 or 29/30 - Final talks with timed presentations. | ||
Line 42: | Line 42: | ||
#** Reconstruction requirements (tape, CPU, disk) | #** Reconstruction requirements (tape, CPU, disk) | ||
#** Analysis requirements (offsite transfer bandwidth/volume, CPU/GPU) | #** Analysis requirements (offsite transfer bandwidth/volume, CPU/GPU) | ||
− | #* Software Milestones/Challenges | + | #* '''Software Milestones/Challenges''' |
− | #** [https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/Milestones.pdf PDF] | + | #** '''[https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/Milestones.pdf PDF]''' |
− | #** [https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/Milestones.ods LibreOffice Spreadsheet] | + | #** '''[https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/Milestones.ods LibreOffice Spreadsheet]''' ''(same as above)'' |
#** ATLAS Milestones [[Media:ATLAS_Milestones_2001.pdf|PDF]] ([http://www.usatlas.bnl.gov/computing/meet/0110PcapReview/0110SW.ppt full talk]) | #** ATLAS Milestones [[Media:ATLAS_Milestones_2001.pdf|PDF]] ([http://www.usatlas.bnl.gov/computing/meet/0110PcapReview/0110SW.ppt full talk]) | ||
#* Calibration/Alignment | #* Calibration/Alignment |
Revision as of 08:47, 27 April 2012
Main Hall-D Software Review Page
Contents
Connecting
Phone:
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Agenda
- Previous Meeting (Apr. 20, 2012)
- Status of Review Organization (JLab organizers)
- Time-line for preparations
-
April 10 -
April 13:-
How many talks each hall will be presenting in the morning session -
Ideas/suggestion for the parallel session
-
- May 1 - talk outlines
- April 30 - Written material for the review (See Apr. 11 e-mail from Curtis).
- May 14/15 - First draft of presentations for dry run.
- May 24/25 or 29/30 - Final talks with timed presentations.
- June7/8 Software Review at JLab.
-
- Organization of Hall-D preparations for Review
- Introductory talk (preliminary sildes) with notes.
- Numbers for the table
- Software Manpower within collaboration (PDF,ODS)
- 2012 Offline Computing Schedule (PDF )
- Computing Resources within the Collaboration (PDF , ODS)
- Simulation requirements (GRID, CPU, disk space)
- Reconstruction requirements (tape, CPU, disk)
- Analysis requirements (offsite transfer bandwidth/volume, CPU/GPU)
- Software Milestones/Challenges
- LibreOffice Spreadsheet (same as above)
- ATLAS Milestones PDF (full talk)
- Calibration/Alignment
Minutes
TBD
Action Items
TBD