Difference between revisions of "2012 Software Review Planning Meeting: Apr. 27, 2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 40: Line 40:
 
#** Computing Resources within the Collaboration ([https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/ComputingResources.pdf PDF] , [https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/ComputingResources.ods ODS])
 
#** Computing Resources within the Collaboration ([https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/ComputingResources.pdf PDF] , [https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/ComputingResources.ods ODS])
 
#** Simulation requirements (GRID, CPU, disk space)
 
#** Simulation requirements (GRID, CPU, disk space)
 +
#***  [https://halldsvn.jlab.org/repos/trunk/home/marki/gluex/docs/comp_mod/computing_model.xls Spreadsheet] ([[Dave's preliminary comment's on offline computing spreadsheet numbers|comments]])
 
#** Reconstruction requirements (tape, CPU, disk)
 
#** Reconstruction requirements (tape, CPU, disk)
 
#** Analysis requirements (offsite transfer bandwidth/volume, CPU/GPU)
 
#** Analysis requirements (offsite transfer bandwidth/volume, CPU/GPU)

Revision as of 09:50, 27 April 2012

Main Hall-D Software Review Page


Connecting

Phone:

  • +1-866-740-1260 : US+Canada
  • +1-303-248-0285 : International
  • then enter participant code: 3421244# (remember the "#").
  • or www.readytalk.com (and code without the #)

Agenda

  1. Previous Meeting (Apr. 20, 2012)
  2. Status of Review Organization (JLab organizers)
    • Committee (Wenaus(chair), Marchand, McBride, Purske, +1??)
    • Charge
    • Agenda
  3. Time-line for preparations
  4. Organization of Hall-D preparations for Review

Minutes

TBD

Action Items

TBD