− | + | Attendees: David L., Mark I., Curtis M., Matt S. | |
− | Attendees: David L., Mark I., Curtis M., | + | |
− | -- | + | ==Status of Review Organization== |
+ | David reminded everyone of what he reported a the the bi-weekly collab. meeting earlier in the week. Specifically, that he spoke briefly with Chip and encouraged him to not include the online in the Software Review as it might dilute the effectiveness by including far too much material. Chip was a little vague stating that the focus was clearly on the offline, but that the online would also be included. | ||
+ | |||
+ | David speculated that Chip may be taking a narrower view of the online that does not include things like read-out-lists, EPICS GUIs and archivers, etc. Curtis pointed out that those things should be covered by the 12GeV project schedule, but the offline is not, which seems to have been a large motivation for this review. | ||
+ | |||
+ | ==Multi-hall software collaboration effort== | ||
+ | |||
+ | We discussed the two meetings that occurred at JLab earlier this week between Halls B and D. The first dealt directly with tracking code. The second with JANA and CLARA. Hall-B was interested in a joint development project where code from common tools could be used by both halls. The consensus from Hall-D folks seems to be that this turns out to be very difficult in that a majority of the effort that goes into tracking turns out to be detector specific. | ||
+ | |||
+ | ==Software Manpower within collaboration== | ||
+ | |||
+ | ==Offline Computing Schedule== | ||
+ | |||
+ | ==Software Milestones/Challenges== | ||
+ | No action has occurred in this area | ||
=Action Items= | =Action Items= |
Revision as of 16:38, 10 February 2012
Main Hall-D Software Review Page
Contents
Connecting
Phone:
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#"). Phone connection only upon request.
- or www.readytalk.com (and code without the #)
Agenda
- Previous Meeting (Feb. 3, 2012)
- Status of Review Organization (JLab organizers)
- Multi-hall software collaboration effort
- Organization of Hall-D preparations for Review
- Software Manpower within collaboration (Mark)
- 2012 Offline Computing Schedule (David)
- Software Milestones/Challenges
Minutes
Attendees: David L., Mark I., Curtis M., Matt S.
Status of Review Organization
David reminded everyone of what he reported a the the bi-weekly collab. meeting earlier in the week. Specifically, that he spoke briefly with Chip and encouraged him to not include the online in the Software Review as it might dilute the effectiveness by including far too much material. Chip was a little vague stating that the focus was clearly on the offline, but that the online would also be included.
David speculated that Chip may be taking a narrower view of the online that does not include things like read-out-lists, EPICS GUIs and archivers, etc. Curtis pointed out that those things should be covered by the 12GeV project schedule, but the offline is not, which seems to have been a large motivation for this review.
Multi-hall software collaboration effort
We discussed the two meetings that occurred at JLab earlier this week between Halls B and D. The first dealt directly with tracking code. The second with JANA and CLARA. Hall-B was interested in a joint development project where code from common tools could be used by both halls. The consensus from Hall-D folks seems to be that this turns out to be very difficult in that a majority of the effort that goes into tracking turns out to be detector specific.
Software Manpower within collaboration
Offline Computing Schedule
Software Milestones/Challenges
No action has occurred in this area