Difference between revisions of "2013-09-18"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday September 18, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. =...")
 
Line 40: Line 40:
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===
 
* Calorimeters:
 
* Calorimeters:
** Calorimetry [[Aug 27, 2013 Calorimetry| August 27, 2013]]
+
** Calorimetry [[Sep 10, 2013 Calorimetry| September 10, 2013]]
 
** BCAL Readout [[Aug 6,2013 Readout|August 6, 2013]] Last Meeting!!
 
** BCAL Readout [[Aug 6,2013 Readout|August 6, 2013]] Last Meeting!!
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-09-03 | September 3, 2013]]
+
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-09-17 | September 17, 2013]]
* Tracking [[August 28, 2013 tracking CDC/FDC| August 28, 2013]]
+
* Tracking [[September 11, 2013 tracking CDC/FDC| September 11, 2013]]
 
** CDC  
 
** CDC  
 
** FDC  
 
** FDC  
 
* PID  
 
* PID  
 
** TOF [[GlueX TOF Meeting, August 29, 2013|August 29, 2013]]  
 
** TOF [[GlueX TOF Meeting, August 29, 2013|August 29, 2013]]  
** Start Counter [[GlueX Start Counter Meeting, August 22, 2013#Minutes|August 22, 2013]]
+
** Start Counter [[GlueX Start Counter Meeting, September 5, 2013#Minutes|September 5, 2013]]
** PID Upgrades [[August 23, 2013 PID Upgrade|August 23, 2013]]
+
** PID Upgrades [[September 6, 2013 PID Upgrade|September 6, 2013]]
 
* Engineering  
 
* Engineering  
 
** Magnet
 
** Magnet
 
** Target  
 
** Target  
 
** Engineering Activities
 
** Engineering Activities
** Installation [[August 30, 2013 Installation|August 30, 2013 Installation]]
+
** Installation [[September 13, 2013 Installation|September 13, 2013 Installation]]
 
* Electronics
 
* Electronics
 
* Trigger  
 
* Trigger  
** Hardware (Level-1) [[OWG Meeting 14-Aug-2013 |August 14, 2013]]
+
** Hardware (Level-1) [[OWG Meeting 11-Sep-2013 |September 11, 2013]]
 
** Software (Level-3) [[September 3, 2013| September 3, 2013]]
 
** Software (Level-3) [[September 3, 2013| September 3, 2013]]
* DAQ/Monitoring/Controls [[OWG Meeting 14-Aug-2013 |August 14, 2013]]
+
* DAQ/Monitoring/Controls [[OWG Meeting 11-Sep-2013 |September 11, 2013]]
 
* Offline [[GlueX Offline Meeting, August 21, 2013|August 21, 2013]]
 
* Offline [[GlueX Offline Meeting, August 21, 2013|August 21, 2013]]
* Photon Beam and Tagger [[BLTWG Meeting 08/19/2013|August 19, 2013]]
+
* Photon Beam and Tagger [[BLTWG Meeting 09/16/2013|September 16, 2013]]
* Physics [[August 26, 2013, Physics Working Group|August 26, 2013]]
+
* Physics [[September 9, 2013, Physics Working Group|September 9, 2013]]

Revision as of 12:46, 17 September 2013

Meeting Time and Place

The meeting will be on Wednesday September 18, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Polycom RealPresence App on iOS and Android:

   Call 8542553@gk1.es.net

3.) Phone: (should not be needed)

  +1-866-740-1260 : US and Canada
  +1-303-248-0285 : International
    then use participant code: 3421244# (the # is needed when using the phone)
  or www.readytalk.com
   then type access code 3421244 into "join a meeting" (you need java plugin)

Agenda

Announcements

  1. Solenoid Status
  2. Collaboration Meeting October 3-5, 2013.
  3. Trip to SLAC to discuss DIRC
  4. Online Data Challenge (Slides)

MOU and Contract Status

Reports from Technical Groups