Difference between revisions of "2014-08-20"

From GlueXWiki
Jump to: navigation, search
(Ongoing Activities)
(Reports from Technical Groups)
Line 31: Line 31:
  
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===
* Calorimeters: [[Jul 31, 2014 Calorimetry | July 31, 2014]]
+
* Calorimeters: [[Aug 14, 2014 Calorimetry | August 14, 2014]]
 
** FCAL
 
** FCAL
 
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook]
 
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook]
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-06-26 | June 26, 2014]]
+
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-08-07| August 7, 2014]]
* Tracking [[Minutes-7-31-2014|Joint FDC/CDC Meeting July 31, 2014]]
+
* Tracking [[Minutes-8-14-2014|Joint FDC/CDC Meeting August 14, 2014]]
 
** CDC  
 
** CDC  
 
** FDC  
 
** FDC  
 
** FADC FPGA [[FADC_Data_Format_July_22,_2014 |July 22, 2014]]
 
** FADC FPGA [[FADC_Data_Format_July_22,_2014 |July 22, 2014]]
 
* PID  
 
* PID  
** TOF [[GlueX TOF Meeting, August 5, 2014|August 5, 2014]]
+
** TOF [[GlueX TOF Meeting, August 12, 2014|August 12, 2014]]
 
***[ https://logbooks.jlab.org/entry/3289258 Logbook entry of TOF cosmic trigger]
 
***[ https://logbooks.jlab.org/entry/3289258 Logbook entry of TOF cosmic trigger]
 
** Start Counter [[GlueX Start Counter Meeting, July 24, 2014#Minutes|July 24, 2014]]
 
** Start Counter [[GlueX Start Counter Meeting, July 24, 2014#Minutes|July 24, 2014]]
** PID Upgrades [[August 1, 2014 PID Upgrade|August 1, 2014]]
+
** PID Upgrades [[August 15, 2014 PID Upgrade|August 15, 2014]]
 
* DAQ/Monitoring/Controls [[OWG Meeting 30-Jul-2014 |July 30, 2014]]
 
* DAQ/Monitoring/Controls [[OWG Meeting 30-Jul-2014 |July 30, 2014]]
 
* Engineering  
 
* Engineering  
Line 56: Line 56:
 
** Software (Level-3) [[June 10, 2014| June 10, 2014]]
 
** Software (Level-3) [[June 10, 2014| June 10, 2014]]
 
* Offline Software  
 
* Offline Software  
** Offline [[GlueX Offline Meeting, July 23, 2014|July 23, 2014]]
+
** Offline [[GlueX Offline Meeting, August 6, 2014|August 6, 2014]]
** Calibration [[July 30, 2014 Calibration| July 30, 2014]]
+
** Calibration [[August 13, 2014 Calibration| August 13, 2014]]
* Photon Beam and Tagger [[BLTWG Meeting 08/04/2014|August 4, 2014]]
+
* Photon Beam and Tagger [[BLTWG Meeting 08/18/2014|August 18, 2014]]
* Physics [[July 28, 2014, Physics Working Group|July 28, 2014]]
+
* Physics [[August 11, 2014, Physics Working Group|August 11, 2014]]

Revision as of 12:14, 19 August 2014

Meeting Time and Place

The meeting will be on Wednesday August 20, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

Ongoing Activities

Reports from Technical Groups