Difference between revisions of "2014-08-20"

From GlueXWiki
Jump to: navigation, search
(Ongoing Activities)
(Reports from Technical Groups)
Line 44: Line 44:
 
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-08-07| August 7, 2014]]
 
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-08-07| August 7, 2014]]
 
* Tracking [[Minutes-8-14-2014|Joint FDC/CDC Meeting August 14, 2014]]
 
* Tracking [[Minutes-8-14-2014|Joint FDC/CDC Meeting August 14, 2014]]
** CDC  
+
** CDC [https://logbooks.jlab.org/entry/3291616 Curved Tracks]
 
** FDC  
 
** FDC  
 
** FADC FPGA [[FADC_Data_Format_July_22,_2014 |July 22, 2014]]
 
** FADC FPGA [[FADC_Data_Format_July_22,_2014 |July 22, 2014]]

Revision as of 10:19, 20 August 2014

Meeting Time and Place

The meeting will be on Wednesday August 20, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

  • Accelerator Readiness Review August 26-28, 2014
  • Collaboration Meeting October 2-4, 2014
  • Running in Fall 2014
    • Run Coordinator - Alexandre Deur
    • Physics Division Liaison - Yi Qiang
    • Shift Scheduler - Reinhard Schumacher
    • Shift Schedule site up early next week.
    • Analysis Coordinator - Volker Crede or designate from Physics group.
  • Solenoid

Ongoing Activities

  • Solenoid Current Studies
  • Commissioning Plans
  • Running in Fall 2014 --- Shifts
    • Schedule site available next week.
    • Need to schedule early October to early December, actual run is 3 weeks.
  • Technical Construction Report

Reports from Technical Groups