Difference between revisions of "2014-08-20"

From GlueXWiki
Jump to: navigation, search
(Reports from Technical Groups)
(Ongoing Activities)
Line 22: Line 22:
 
* Solenoid
 
* Solenoid
  
=== Ongoing Activities ===
+
=== Running in Fall 2014 ===
* Running in Fall 2014
+
* Coordination
 
** Run Coordinator - Alexandre Deur
 
** Run Coordinator - Alexandre Deur
 
** Physics Division Liaison - Yi Qiang
 
** Physics Division Liaison - Yi Qiang
Line 29: Line 29:
 
** Shift Schedule site up early next week.
 
** Shift Schedule site up early next week.
 
** Analysis Coordinator - Volker Crede or designate from Physics group.
 
** Analysis Coordinator - Volker Crede or designate from Physics group.
 +
* Plans
 
** [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan]
 
** [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan]
 
** [https://hdops.jlab.org/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan]
 
** [https://hdops.jlab.org/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan]
 
** [https://hdops.jlab.org/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning]
 
** [https://hdops.jlab.org/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning]
 
** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below)
 
** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below)
 +
* Manpower
 
** Shift Schedule site available next week. We need to schedule early October to early December, actual run is 3 weeks.
 
** Shift Schedule site available next week. We need to schedule early October to early December, actual run is 3 weeks.
 +
 +
=== Ongoing Activities ===
 
* Technical Construction Report
 
* Technical Construction Report
 
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report]
 
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report]
 
**[https://halldweb1.jlab.org/wiki/index.php/StatusTable TCR Status]
 
**[https://halldweb1.jlab.org/wiki/index.php/StatusTable TCR Status]
 +
* Solenoid Current Studies
  
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===

Revision as of 10:33, 20 August 2014

Meeting Time and Place

The meeting will be on Wednesday August 20, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

Running in Fall 2014

  • Coordination
    • Run Coordinator - Alexandre Deur
    • Physics Division Liaison - Yi Qiang
    • Shift Scheduler - Reinhard Schumacher
    • Shift Schedule site up early next week.
    • Analysis Coordinator - Volker Crede or designate from Physics group.
  • Plans
  • Manpower
    • Shift Schedule site available next week. We need to schedule early October to early December, actual run is 3 weeks.

Ongoing Activities

Reports from Technical Groups