Difference between revisions of "2014-10-15"
From GlueXWiki
(→Reports from Technical Groups) |
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki") |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 27: | Line 27: | ||
** Analysis Coordinator - Volker Crede or designate from Physics group | ** Analysis Coordinator - Volker Crede or designate from Physics group | ||
* Plans | * Plans | ||
− | ** [https:// | + | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan] |
− | ** [https:// | + | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan] |
− | ** [https:// | + | ** [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning] |
** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below) | ** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below) | ||
* Manpower | * Manpower | ||
Line 38: | Line 38: | ||
* Technical Construction Report | * Technical Construction Report | ||
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report] | ** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report] | ||
− | **[https:// | + | **[https://halldweb.jlab.org/wiki/index.php/StatusTable TCR Status] |
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
Line 44: | Line 44: | ||
** FCAL | ** FCAL | ||
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook] | ** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook] | ||
− | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014 | + | ** BCAL Reconstruction BCAL [[BCAL Reconstruction Meeting 2014-09-18 | September 18, 2014]] |
* Tracking [[Minutes-10-9-2014|Joint FDC/CDC Meeting October 9, 2014]] | * Tracking [[Minutes-10-9-2014|Joint FDC/CDC Meeting October 9, 2014]] | ||
** CDC | ** CDC |
Latest revision as of 20:45, 31 March 2015
_TOC__
Contents
Meeting Time and Place
The meeting will be on Wednesday October 15, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Schedule Update
Running in Fall 2014
- Coordination
- Run Coordinator - Alexandre Deur
- Physics Division Liaison - Yi Qiang
- Shift Scheduler - Reinhard Schumacher
- Analysis Coordinator - Volker Crede or designate from Physics group
- Plans
- Manpower
- Shift Schedule site available
- Schedule October now
Ongoing Activities
- Technical Construction Report
Reports from Technical Groups
- Calorimeters: October 9, 2014
- FCAL
- BCAL - BCAL Logbook
- BCAL Reconstruction BCAL September 18, 2014
- Tracking Joint FDC/CDC Meeting October 9, 2014
- CDC
- FDC
- FADC FPGA October 14, 2014
- PID
- TOF October 7, 2014
- Start Counter August 21, 2014
- PID Upgrades August 29, 2014
- DAQ/Monitoring/Controls October 8, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) October 8, 2014
- Software (Level-3) September 2, 2014
- Offline Software
- Offline September 3, 2014
- Calibration October 8, 2014
- Photon Beam and Tagger October 13, 2014
- Physics October 6, 2014