Difference between revisions of "2014-10-15"

From GlueXWiki
Jump to: navigation, search
(Created page with "_TOC__ == Meeting Time and Place == The meeting will be on Wednesday October 15, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. == M...")
 
(Reports from Technical Groups)
Line 41: Line 41:
  
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===
* Calorimeters: [[Sep 11, 2014 Calorimetry | September 11, 2014]]
+
* Calorimeters: [[Oct 9, 2014 Calorimetry | October 9, 2014]]
 
** FCAL
 
** FCAL
 
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook]
 
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook]
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-09-04| September 4, 2014]]
+
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-10-09| October 9, 2014]]
* Tracking [[Minutes-9-11-2014|Joint FDC/CDC Meeting September 11, 2014]]
+
* Tracking [[Minutes-10-9-2014|Joint FDC/CDC Meeting October 9, 2014]]
 
** CDC  
 
** CDC  
 
** FDC  
 
** FDC  
** FADC FPGA [[FADC_Data_Format_September_16,_2014 |September 16, 2014]]
+
** FADC FPGA [[FADC_Data_Format_October_14,_2014 |October 14, 2014]]
 
* PID  
 
* PID  
** TOF [[GlueX TOF Meeting, September 9, 2014|September 9, 2014]]
+
** TOF [[GlueX TOF Meeting, October 7, 2014|October 7, 2014]]
 
** Start Counter [[GlueX Start Counter Meeting, August 21, 2014#Minutes|August 21, 2014]]
 
** Start Counter [[GlueX Start Counter Meeting, August 21, 2014#Minutes|August 21, 2014]]
 
*** [http://gluex.phys.uregina.ca/photos Start Counter Construction and Installation]
 
*** [http://gluex.phys.uregina.ca/photos Start Counter Construction and Installation]
 
** PID Upgrades [[August 29, 2014 PID Upgrade|August 29, 2014]]
 
** PID Upgrades [[August 29, 2014 PID Upgrade|August 29, 2014]]
* DAQ/Monitoring/Controls [[OWG Meeting 10-Sep-2014 |September 10, 2014]]
+
* DAQ/Monitoring/Controls [[OWG Meeting 9-Oct-2014 |October 8, 2014]]
 
* Engineering  
 
* Engineering  
 
** Magnets
 
** Magnets
Line 62: Line 62:
 
* Electronics
 
* Electronics
 
* Trigger  
 
* Trigger  
** Hardware (Level-1) [[OWG Meeting 10-Sep-2014 |September 10, 2014]]
+
** Hardware (Level-1) [[OWG Meeting 8-Oct-2014 |October 8, 2014]]
 
** Software (Level-3) [[September 2, 2014| September 2, 2014]]
 
** Software (Level-3) [[September 2, 2014| September 2, 2014]]
 
* Offline Software  
 
* Offline Software  
 
** Offline [[GlueX Offline Meeting, September 3, 2014|September 3, 2014]]
 
** Offline [[GlueX Offline Meeting, September 3, 2014|September 3, 2014]]
 
** Calibration [[September 10, 2014 Calibration| September 10, 2014]]
 
** Calibration [[September 10, 2014 Calibration| September 10, 2014]]
* Photon Beam and Tagger [[BLTWG Meeting 09/15/2014|September 15, 2014]]
+
* Photon Beam and Tagger [[BLTWG Meeting 10/13/2014|October 13, 2014]]
 
* Physics [[September 8, 2014, Physics Working Group|September 8, 2014]]
 
* Physics [[September 8, 2014, Physics Working Group|September 8, 2014]]
 
** [[Solenoid Current Studies]]  
 
** [[Solenoid Current Studies]]  
 
** [https://www.dropbox.com/s/0p1iuhpnc4ialzu/GlueXCurrentStudies.xlsx?dl=0 Excel File]
 
** [https://www.dropbox.com/s/0p1iuhpnc4ialzu/GlueXCurrentStudies.xlsx?dl=0 Excel File]

Revision as of 14:34, 14 October 2014

_TOC__

Meeting Time and Place

The meeting will be on Wednesday October 15, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

  • Accelerator Schedule Update

Running in Fall 2014

Ongoing Activities

Reports from Technical Groups