Difference between revisions of "2014-10-29"

From GlueXWiki
Jump to: navigation, search
(Reports from Technical Groups)
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki")
 
(18 intermediate revisions by 7 users not shown)
Line 1: Line 1:
_TOC__
+
__TOC__
 
== Meeting Time and Place ==
 
== Meeting Time and Place ==
  
Line 13: Line 13:
 
#* US or Canada: +1 408 740 7256 or  
 
#* US or Canada: +1 408 740 7256 or  
 
#* US or Canada: +1 888 240 2560
 
#* US or Canada: +1 888 240 2560
# <font color=blue>Upon connection all microphones are automatically muted.  To unmute your mike on a Polycom or equivalent unit, enter *4.  Unmuting on a computer is trivial as there is a microphone button than can be clicked.</font>
+
# <font color=red>Upon connection all microphones are automatically muted.  To unmute your mike on a Polycom or equivalent unit, enter *4.  Unmuting on a computer is trivial as there is a microphone button than can be clicked.</font>
 
# More information on connecting to [[Connect to the Data Challenge Meetings|bluejeans]] is available.
 
# More information on connecting to [[Connect to the Data Challenge Meetings|bluejeans]] is available.
  
Line 25: Line 25:
 
** Physics Division Liaison - Yi Qiang
 
** Physics Division Liaison - Yi Qiang
 
** Shift Scheduler - Reinhard Schumacher
 
** Shift Scheduler - Reinhard Schumacher
** Offline Analysis - Paul Mattione  
+
** Offline Data Monitoring - Paul Mattione  
* Log Book
+
 
** [https://logbooks.jlab.org/book/halld Online Logbook]
 
** [https://logbooks.jlab.org/book/halld Online Logbook]
* Plans
+
** [http://www.jlab.org/Hall-D/shifts Shift Schedule]
** [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan]
+
** [https://hdops.jlab.org/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan]
+
** [https://hdops.jlab.org/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning]
+
** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below)
+
* Manpower
+
** [http://www.jlab.org/Hall-D/shifts Shift Schedule] site available
+
** Schedule October now
+
  
=== Ongoing Activities ===
+
=== Run Report ===
* Technical Construction Report
+
* Run Coordinator Report
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report]
+
** [https://userweb.jlab.org/~deurpam/RC_report_10_29_2014.pdf Weekly RC report to accelerator weekly meeting (Wednesday, 1:30pm)]
**[https://halldweb1.jlab.org/wiki/index.php/StatusTable TCR Status]
+
** [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan]
 +
** [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning]
 +
* Online Data Taking Reports
 +
** Level-1 Trigger Status
 +
** Controls
 +
** DAQ
 +
** Monitoring
 +
* Beamline Status
 +
** Summary of Beam Conditions
 +
** BPMs
 +
** Active Collimator
 +
** Pair Spectrometer
 +
** Hodoscope
 +
** Microscope
 +
* Offline Analysis [[GlueX Offline Meeting, October 15, 2014|October 15, 2014]]
 +
** Software Status
 +
** Data Quality [https://halldweb.jlab.org/hdops/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan]
 +
** Offline Monitoring
 +
*** [https://halldweb.jlab.org/cgi-bin/data_monitoring/ver0.2/runBrowser.py Run Browser] and [https://halldweb.jlab.org/cgi-bin/data_monitoring/ver0.2/timeSeries.py Time Series] webpages
 +
** Calibration [[October 22, 2014 Calibration| October 22, 2014]]
  
=== Reports from Technical Groups ===
+
=== Detector Status ===
* Calorimeters: [[Oct 9, 2014 Calorimetry | October 9, 2014]]
+
* Engineering Activities
** FCAL
+
** Activities
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook]
+
** Magnets
** BCAL Reconstruction BCAL [[BCAL Reconstruction Meeting 2014-09-18 | September 18, 2014]]
+
* Electronics Activities
* Tracking [[Minutes-10-9-2014|Joint FDC/CDC Meeting October 9, 2014]]
+
* Start Counter [[GlueX Start Counter Meeting, October 16, 2014#Minutes|October 16, 2014]]
 +
* Tracking [[Minutes-10-23-2014|Joint FDC/CDC Meeting October 23, 2014]]
 
** CDC  
 
** CDC  
 
** FDC  
 
** FDC  
** FADC FPGA [[FADC_Data_Format_October_14,_2014 |October 14, 2014]]
+
** FADC FPGA [[FADC_Data_Format_October_28,_2014 |October 28, 2014]]
* PID
+
* Calorimeters: [[Oct 23, 2014 Calorimetry | October 23, 2014]]
** TOF [[GlueX TOF Meeting, October 7, 2014|October 7, 2014]]
+
** FCAL
** Start Counter [[GlueX Start Counter Meeting, August 21, 2014#Minutes|August 21, 2014]]
+
** BCAL
*** [ https://logbooks.jlab.org/book/hdstartcounter Start Counter Log Book]
+
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-10-16 | October 16, 2014]]
** PID Upgrades [[August 29, 2014 PID Upgrade|August 29, 2014]]
+
* TOF [[GlueX TOF Meeting, October 21, 2014|October 21, 2014]], [http://hadron.physics.fsu.edu/~aristeidis/fix.pdf plot]
* DAQ/Monitoring/Controls [[OWG Meeting 9-Oct-2014 |October 8, 2014]]
+
 
* Engineering
+
=== Other Activities ===
** Magnets
+
* Physics [[October 20, 2014, Physics Working Group|October 20, 2014]]
** Target
+
** Engineering Activities
+
** Installation
+
* Electronics
+
* Trigger
+
** Hardware (Level-1) [[OWG Meeting 8-Oct-2014 |October 8, 2014]]
+
** Software (Level-3) [[September 2, 2014| September 2, 2014]]
+
* Offline Software
+
** Offline [[GlueX Offline Meeting, September 3, 2014|September 3, 2014]]
+
** Calibration [[October 8, 2014 Calibration| October 8, 2014]]
+
* Photon Beam and Tagger [[BLTWG Meeting 10/13/2014|October 13, 2014]]
+
* Physics [[October 6, 2014, Physics Working Group|October 6, 2014]]
+
 
** [[Solenoid Current Studies]]  
 
** [[Solenoid Current Studies]]  
** [https://www.dropbox.com/s/0p1iuhpnc4ialzu/GlueXCurrentStudies.xlsx?dl=0 Excel File]
+
* PID Upgrades [[August 29, 2014 PID Upgrade|August 29, 2014]]
 +
* Software (Level-3) [[September 2, 2014| September 2, 2014]]
 +
* Technical Construction Report
 +
* AOT

Latest revision as of 00:14, 1 April 2015

Meeting Time and Place

The meeting will be on Wednesday October 29, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

  • Accelerator Schedule Update

Running in Fall 2014

  • Coordination
    • Run Coordinator - Alexandre Deur
    • Physics Division Liaison - Yi Qiang
    • Shift Scheduler - Reinhard Schumacher
    • Offline Data Monitoring - Paul Mattione
    • Online Logbook
    • Shift Schedule

Run Report

Detector Status

Other Activities