Difference between revisions of "2016-03-30"
From GlueXWiki
(→Announcements) |
(→Detector Updates) |
||
Line 55: | Line 55: | ||
** Magnets | ** Magnets | ||
** Other Activities | ** Other Activities | ||
− | * Beamline Status [[BLTWG Meeting 03/ | + | * Beamline Status [[BLTWG Meeting 03/28/2016|March 28, 2016]] |
** Diamonds | ** Diamonds | ||
** Active Collimator | ** Active Collimator | ||
Line 62: | Line 62: | ||
** Microscope | ** Microscope | ||
** Polarimeter | ** Polarimeter | ||
− | * Start Counter [[GlueX Start Counter Meeting, | + | * Start Counter [[GlueX Start Counter Meeting, March 24, 2016|March 24, 2016]] |
− | * Tracking [[minutes-3- | + | * Tracking [[minutes-3-24-2016|March 24, 2016]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
− | * Calorimeters: [[Mar | + | * Calorimeters: [[Mar 24, 2016 Calorimetry|March 24, 2016]] |
** BCAL | ** BCAL | ||
** FCAL | ** FCAL | ||
* TOF [[GlueX TOF Meeting, March 8, 2016|March 8, 2016]] | * TOF [[GlueX TOF Meeting, March 8, 2016|March 8, 2016]] | ||
− | * DIRC System [[March | + | * DIRC System [[March 25, 2016 PID Upgrade|March 25, 2016 PID Upgrade]] |
=== Other Activities === | === Other Activities === | ||
* AOT | * AOT |
Revision as of 11:09, 29 March 2016
Contents
Meeting Time and Place
The meeting will be on Wednesday March 30, 2016 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Update
- Nuclear Photoproduction with GlueX April 28-29
- Collaboration Meeting May 9-11
- The May Physics / Analysis Workshop after May Collaboration Meeting, May 11-13
Run Planning for Spring 2016
- Run Coordination Meetings: Spring 2016 Run
- Progress report for the last two weeks: File:RC report gluex weekly march16 2016.pdf
- Time charts for the last 4 weeks, readjusted for the CHL repair
- Shift Schedule
Analysis Activities
- Updates on results from the Spring 2016 Run.
- Offline Activities March 16, 2016
- Software Status
- Data Challenge 3
- Offline Monitoring
- Calibration March 23, 2016 - Calibration Dashboard
- Calibration Passes on Data
- Physics and Analysis March 21, 2016
- Physics Working Group
- Analysis Activities Reaction page with plugins
Data Acquisition and Electronics Systems
- Online Systems January 27, 2016
- DAQ
- Controls Status
- Monitoring
- Level-3 Trigger
- Electronics and Trigger
- Electronics Update
- FADC FPGA Jan 28, 2016
- Level-1 Trigger
Detector Updates
- Engineering Activities
- Target
- Magnets
- Other Activities
- Beamline Status March 28, 2016
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter March 24, 2016
- Tracking March 24, 2016
- CDC
- FDC
- Calorimeters: March 24, 2016
- BCAL
- FCAL
- TOF March 8, 2016
- DIRC System March 25, 2016 PID Upgrade
Other Activities
- AOT