Difference between revisions of "2017-01 recon ver02 plans"
From GlueXWiki
Line 1: | Line 1: | ||
+ | |||
+ | === Checklist === | ||
+ | |||
+ | * New TOF ADC/TDC hit matching? (Beni) | ||
+ | |||
+ | === Plans === | ||
+ | |||
These improvements are expected to go into the next round of reconstructed data: | These improvements are expected to go into the next round of reconstructed data: | ||
Revision as of 15:54, 17 October 2017
Checklist
- New TOF ADC/TDC hit matching? (Beni)
Plans
These improvements are expected to go into the next round of reconstructed data:
- improved CDC dE/dx calculation
- use of ADC amplitude instead of integral - dE/dx vs theta
- updated truncation value
- improved TOF calibrations
- use of ADC amplitude instead of integral
-
new SC attenuation length corrections - BCAL charged track clusterizer
- FCAL updates
- Updated gains (fix problems with inner rings)
- Updated timing (fix high-rate running problem)
- Update geometry?
- updated charged/neutral error matrices?
Outstanding questions:
- What is the bump in BCAL & FCAL monitoring delta T distributions at +4 ns?
- What is the bump in SC monitoring delta T distributions at ~ -8 ns?
- What is the inefficiency in the TOF matching efficiency near the beam hole due to?
- What is going on with the BCAL positions measurements?