2017-01 recon ver02 plans

From GlueXWiki
Revision as of 12:18, 13 September 2017 by Sdobbs (Talk | contribs)

Jump to: navigation, search

These improvements are expected to go into the next round of reconstructed data:

  • improved CDC dE/dx calculation
    • use of ADC amplitude instead of integral - dE/dx vs theta
    • updated truncation value
    • space-charge effect corrections?
  • improved TOF calibrations
    • use of ADC amplitude instead of integral
  • new SC attenuation length corrections
  • BCAL charged track clusterizer
  • New FCAL geometry and updated calibrations?
  • updated charged/neutral error matrices