Difference between revisions of "2017-07-19"

From GlueXWiki
Jump to: navigation, search
(Detector Updates)
(Analysis Activities)
 
Line 23: Line 23:
 
* Offline Software [[GlueX Offline Meeting, July 12, 2017| July 12, 2017]]
 
* Offline Software [[GlueX Offline Meeting, July 12, 2017| July 12, 2017]]
 
** Update on OSG and NSERC Activities
 
** Update on OSG and NSERC Activities
* Production and Analysis Working Group [[July 12, 2017, Production & Analysis Working Group|July 12, 2017]]
+
* Production and Analysis Working Group [[July 11, 2017, Production & Analysis Working Group|July 11, 2017]]
 
* Physics Working Group [https://halldweb.jlab.org/wiki-private/index.php/July_10,_2017,_Physics_Working_Group July 10, 2017]
 
* Physics Working Group [https://halldweb.jlab.org/wiki-private/index.php/July_10,_2017,_Physics_Working_Group July 10, 2017]
 
** Amplitude Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_July_17,_2017 July 17, 2017]
 
** Amplitude Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_July_17,_2017 July 17, 2017]

Latest revision as of 10:46, 19 July 2017

Meeting Time and Place

The meeting will be on Wednesday July 19, 2017 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

  • PAC Results

The Fall 2017 Runs

  • Expected dates early October to ~December 20

Analysis Activities

Data Acquisition and Electronics Systems

  • Online Systems January 11, 2017
    • Online Systems
    • DAQ
    • Controls Status
    • Monitoring
    • High-intensity Running
  • Electronics and Trigger
    • Electronics Update
    • Level-1 Trigger
    • Firmware Updates

Detector Updates

Other Activities

  • AOT