Difference between revisions of "2017-09-26"

From GlueXWiki
Jump to: navigation, search
(Analysis Activities)
(Detector Updates)
Line 52: Line 52:
 
** DIRC
 
** DIRC
 
** Other Activities
 
** Other Activities
* Beamline Status [[BLTWG Meeting 9/11/2017|September 11, 2017]]
+
* Beamline Status [[BLTWG Meeting 9/25/2017|September 25, 2017]]
 
** Diamonds
 
** Diamonds
 
** Active Collimator
 
** Active Collimator
Line 63: Line 63:
 
** CDC  
 
** CDC  
 
** FDC  
 
** FDC  
* Calorimeters: [[Sep 7, 2017 Calorimeter|September 7, 2017]]
+
* Calorimeters: [[Sep 21, 2017 Calorimeter|September 21, 2017]]
 
** BCAL  
 
** BCAL  
 
** FCAL  
 
** FCAL  

Revision as of 08:29, 25 September 2017

Meeting Time and Place

The meeting will be on Tuesday September 26, 2017 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

  • The Fall 2017 run will not start before December 4.
  • GlueX Collaboration Meeting, October 12-14, 2017.
  • Starting in September, Bi-weekly and Physics Meetings will shift to Tuesdays at 11:15am.

The Fall 2017 Runs

  • Expected dates early Desember 4 to ~December 17
  • Winter 2018 will be January 11 to March 22.
  • Outside run coordinators from CMU, UConn & MIT so far (4-6 week coverage of ~12 weeks).
  • Official Run Schedule 2017/2018

Analysis Activities

Data Acquisition and Electronics Systems

  • Online Systems January 11, 2017
    • Online Systems
    • DAQ
    • Controls Status
    • Monitoring
    • High-intensity Running
  • Electronics and Trigger
    • Electronics Update
    • Level-1 Trigger
    • Firmware Updates

Detector Updates

Other Activities

  • AOT