Difference between revisions of "2020-02-25"

From GlueXWiki
Jump to: navigation, search
(Analysis Activities)
(Detector Updates)
Line 66: Line 66:
 
** Microscope
 
** Microscope
 
** Polarimeter
 
** Polarimeter
* Start Counter [[GlueX Start Counter Meeting, January 23, 2020|January 23, 2020]]
+
* Start Counter [[GlueX Start Counter Meeting, February 6, 2020|February 6, 2020]]
* Tracking [[meeting-01-23-2020|January 23, 2020]]
+
* Tracking [[meeting-02-06-2020|February 6, 2020]]
 
** CDC  
 
** CDC  
 
** FDC  
 
** FDC  
* Calorimeters: [[Jan 23, 2020 Calorimeter| January 23, 2020 Calorimeter]]  
+
* Calorimeters: [[Feb 20, 2020 Calorimeter| February 20, 2020 Calorimeter]]  
 
** BCAL
 
** BCAL
 
** FCAL  
 
** FCAL  
 
** COMPCAL
 
** COMPCAL
* TOF [[GlueX TOF Meeting, January 15, 2020|January 15, 2020]]
+
* TOF [[GlueX TOF Meeting, January 29, 2020|January 29, 2020]]
* DIRC System [[January 20, 2020 DIRC|January 20, 2020]]
+
* DIRC System [[February 3, 2020 DIRC|February 3, 2020]]
  
 
=== Other Activities ===
 
=== Other Activities ===
 
* AOT
 
* AOT

Revision as of 22:23, 24 February 2020

Meeting Time and Place

The meeting will be on Tuesday February 25, 2020 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.


Resources

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

Spring 2020 Running

  • Fall/Winter Accelerator Schedule Updated
    • Winter 2020: Start of Physics on Friday January 10, end on Wednesday May 6.
  • Run Status

Analysis Activities

Data Acquisition and Electronics Systems

  • Online Systems 2-Oct-2017
    • Online Systems
    • DAQ
    • Controls Status
    • Monitoring
  • Electronics and Trigger
    • Electronics Update
    • Level-1 Trigger
    • Firmware Updates

Detector Updates

Other Activities

  • AOT