Difference between revisions of "2020-04-21"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Additional brief reports from working groups as needed)
Line 58: Line 58:
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/April_1,_2020,_Analysis_Working_Group April 15, 2020] (Alex)
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/April_1,_2020,_Analysis_Working_Group April 15, 2020] (Alex)
 
** Offline Meeting:  [[GlueX_Software_Meeting,_April_14,_2020| April 14, 2020]] (Mark I.)
 
** Offline Meeting:  [[GlueX_Software_Meeting,_April_14,_2020| April 14, 2020]] (Mark I.)
 +
*** [https://markito3.wordpress.com/2020/04/20/gluex-meeting-report-april-21-2020/ Mark's Notes]
 
** Particle ID Working Group:  no meeting since [[GlueX_PID_Meeting,_April_9,_2020 | April 9, 2020]] (Simon)
 
** Particle ID Working Group:  no meeting since [[GlueX_PID_Meeting,_April_9,_2020 | April 9, 2020]] (Simon)
  

Revision as of 12:15, 20 April 2020

Meeting Coordinates

The meeting will be on Tuesday April 21, 2020 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Status of Hall D hardware (Tim/Eugene)
  3. Critical path issues for GlueX-II production: 2020 Production Page
    • Monitoring status / target monitoring launch this week (Alex/Sean)
    • Outstanding reconstruction issues?
      • Understanding track extrapolation issues to DIRC (Simon/Justin)
        • report from the DIRC workfest
      • Any others?
    • Remaining "to-do" items before reconstruction
      • CDC calibration (Naomi)
      • Microscope data before threshold adjustment (Richard)
      • PS energy calibration (Sasha)
  4. PrimEx reconstruction
    • Upate on calibrations (Sasha)
    • schedule for monitoring launch
  5. May online collaboration meeting (May 11-15) (Matt)
  6. Strategy for PAC
    • Schedule:
      • new proposals due on June 1
      • written material for jeopardy due on June 15
    • New proposals:
      • Neutral pion polarizability: under review by Barry and Jeorg
      • GDH sum rule: under review by Frank and Garth
    • Jeopardy:
  7. Status of SRC proposal review (Curtis)
    • Or indicates things are on hold
  8. Status of GlueX NIM paper (Elton)
    • Collaboration wide review is underway
  9. Specific areas where specialized help is needed
    • Simulation needs: generating samples, OSG issues, updating smearing, ... (Sean)

Additional brief reports from working groups as needed