Difference between revisions of "2020-05-05"

From GlueXWiki
Jump to: navigation, search
(Connecting)
(Agenda)
Line 50: Line 50:
 
#** Meeting to discuss JEF physics and FCAL-II impact:  [https://halldweb.jlab.org/wiki-private/index.php/May,_1_2020,_Physics_Working_Group Physics Woring Group May 1, 2020]
 
#** Meeting to discuss JEF physics and FCAL-II impact:  [https://halldweb.jlab.org/wiki-private/index.php/May,_1_2020,_Physics_Working_Group Physics Woring Group May 1, 2020]
 
#** For reference:  [[Media: Rory_2020-4-1.pdf | Charged pion polarizability plan]] (Rory)
 
#** For reference:  [[Media: Rory_2020-4-1.pdf | Charged pion polarizability plan]] (Rory)
# Status of SRC proposal
+
# Status of SRC proposal (Sasha)
 
#*[[Experiment_Readiness_Review_2020 | ERR planned for Thursday, May 7]]
 
#*[[Experiment_Readiness_Review_2020 | ERR planned for Thursday, May 7]]
 
# Status of GlueX NIM paper (Elton)
 
# Status of GlueX NIM paper (Elton)

Revision as of 15:36, 4 May 2020

Meeting Coordinates

The meeting will be on Tuesday May 5, 2020 at 11:15am EDT.

Connecting

Join from computer or mobile: https://iu.zoom.us/j/93157147171

Meeting ID: 931 5714 7171

IU videoconferencing equipment: 26 931 5714 7171

Videoconferencing equipment outside of IU: SIP: 93157147171@zoomcrc.com

H.323:

  • 162.255.37.11 (US West)
  • 162.255.36.11 (US East)
  • 221.122.88.195 (China)
  • 69.174.57.160 (Canada)

Agenda

  1. Announcements
  2. Status of Hall D hardware (Tim/Eugene)
  3. Critical path issues for GlueX-II production: 2020 Production Page
    • Monitoring status (Alex)
    • Current monitoring launch focus
      • Understanding track extrapolation issues to DIRC (Simon/Justin)
    • Review status at P&A meeting and start final (?) monitoring launch
      • CDC calibration (Naomi)
      • Microscope data before threshold adjustment (Richard)
      • PS energy calibration (Sasha)
  4. PrimEx reconstruction
    • update on calibrations (Sasha)
    • schedule for monitoring launch (Alex)
  5. May online collaboration meeting (May 11-15) (Matt)
  6. PAC proposals
  7. Status of SRC proposal (Sasha)
  8. Status of GlueX NIM paper (Elton)
  9. Specific areas where specialized help is needed
    • Simulation needs: generating samples, OSG issues, updating smearing, ... (Sean)

Additional brief reports from working groups as needed