2020-05-05

From GlueXWiki
Revision as of 08:58, 4 May 2020 by Shepherd (Talk | contribs) (Created page with "== Meeting Coordinates == The meeting will be on Tuesday May 5, 2020 at 11:15am EDT. ==== Connecting ==== == Agenda == # Announcements # Status of Hall D hardware (Tim/Eu...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Coordinates

The meeting will be on Tuesday May 5, 2020 at 11:15am EDT.

Connecting

Agenda

  1. Announcements
  2. Status of Hall D hardware (Tim/Eugene)
  3. Critical path issues for GlueX-II production: 2020 Production Page
    • Monitoring status (Alex)
    • Current monitoring launch focus
      • Understanding track extrapolation issues to DIRC (Simon/Justin)
    • Review status at P&A meeting and start final (?) monitoring launch
      • CDC calibration (Naomi)
      • Microscope data before threshold adjustment (Richard)
      • PS energy calibration (Sasha)
  4. PrimEx reconstruction
    • update on calibrations (Sasha)
    • schedule for monitoring launch (Alex)
  5. Restructing of analysis working groups
  6. May online collaboration meeting (May 11-15) (Matt)
    • Please register here
    • Review/finalize the Agenda
    • Plan to host morning sessions with Zoom
  7. PAC proposals
  8. Status of SRC proposal
  9. Status of GlueX NIM paper (Elton)
  10. Specific areas where specialized help is needed
    • Simulation needs: generating samples, OSG issues, updating smearing, ... (Sean)

Additional brief reports from working groups as needed