Difference between revisions of "2020 Data Production"

From GlueXWiki
Jump to: navigation, search
(Proposed Schedule)
(Overall Calibrations)
Line 49: Line 49:
 
| FCAL gains/non-linearities || Colin Gleason ||
 
| FCAL gains/non-linearities || Colin Gleason ||
 
|-
 
|-
| FCAL timing || ?? ||  
+
| FCAL timing || Colin Gleason ||  
 
|-
 
|-
 
| SC Timewalks || Rupesh Dotel || Done
 
| SC Timewalks || Rupesh Dotel || Done

Revision as of 17:12, 3 February 2020

Spring 2020 Dataset Summary

Proposed Schedule

Finalize Calibrations & Performing Monitoring Launch

  • Batch 1: April 1st
  • Batch 2: ...

Ready for Production

  • Batch 1: May 1st
  • Batch 2: ...

Run-dependent Calibrations

Calibration Person Run Range
Overall Timing Sean Dobbs
CDC gains Naomi Jarvis
CDC time-to-distance Naomi Jarvis
PS/PSC Timing Olga Cortes
TAGH timewalks Olga Cortes
TAGM timewalks Sean Dobbs/Richard Jones
TOF Beni Zihlmann


Overall Calibrations

Calibration Person Status
BCAL channel timing Mark Dalton
BCAL attenuation length/gain ratio Mark Dalton
BCAL z-position Mark Dalton
BCAL gains/non-linearities Karthik Suresh
FCAL gains/non-linearities Colin Gleason
FCAL timing Colin Gleason
SC Timewalks Rupesh Dotel Done
SC Propagation Time Rupesh Dotel