Difference between revisions of "2020 Data Production"
From GlueXWiki
(→Run-dependent Calibrations) |
|||
Line 23: | Line 23: | ||
|- | |- | ||
| CDC gains || Naomi Jarvis || | | CDC gains || Naomi Jarvis || | ||
+ | |- | ||
+ | | CDC dE/dx || Naomi Jarvis || | ||
|- | |- | ||
| CDC time-to-distance || Naomi Jarvis || | | CDC time-to-distance || Naomi Jarvis || | ||
Line 36: | Line 38: | ||
| DIRC || Justin Stevens || | | DIRC || Justin Stevens || | ||
|} | |} | ||
− | |||
== Overall Calibrations == | == Overall Calibrations == |
Revision as of 16:01, 10 February 2020
Proposed Schedule
Finalize Calibrations & Performing Monitoring Launch
- Batch 1: April 1st
- Batch 2: April 15st
- Batch 3: ...
Ready for Production
- Batch 1: May 1st
- Batch 2: May 15st
- Batch 3: ...
Run-dependent Calibrations
Calibration | Person | Run Range |
---|---|---|
Overall Timing | Sean Dobbs | |
CDC gains | Naomi Jarvis | |
CDC dE/dx | Naomi Jarvis | |
CDC time-to-distance | Naomi Jarvis | |
PS/PSC Timing | Olga Cortes | |
TAGH timewalks | Olga Cortes | |
TAGM timewalks | Sean Dobbs/Richard Jones | |
TOF | Beni Zihlmann | |
DIRC | Justin Stevens |
Overall Calibrations
Calibration | Person | Status |
---|---|---|
BCAL channel timing | Mark Dalton | |
BCAL attenuation length/gain ratio | Mark Dalton | |
BCAL z-position | Mark Dalton | |
BCAL gains/non-linearities | Karthik Suresh | |
FCAL gains/non-linearities | Colin Gleason | |
FCAL timing | Colin Gleason | |
SC Timewalks | Rupesh Dotel | Done |
SC Propagation Time | Rupesh Dotel |