Difference between revisions of "2020 Data Production"
From GlueXWiki
(→Overall Calibrations) |
|||
Line 48: | Line 48: | ||
! Calibration !! Person !! Status | ! Calibration !! Person !! Status | ||
|- | |- | ||
− | | BCAL channel timing || Mark Dalton || | + | | BCAL channel timing || Mark Dalton || Done |
|- | |- | ||
| BCAL attenuation length/gain ratio || Mark Dalton || | | BCAL attenuation length/gain ratio || Mark Dalton || |
Revision as of 15:04, 20 February 2020
Contents
Proposed Schedule
Finalize Calibrations & Performing Monitoring Launch
- Batch 1: April 1st
- Batch 2: April 15st
- Batch 3: ...
Ready for Production
- Batch 1: May 1st
- Batch 2: May 15st
- Batch 3: ...
Run-dependent Calibrations
Calibration | Person | Run Range |
---|---|---|
Overall Timing (first pass) | Sean Dobbs | 71336 - 71557 |
Overall Timing (post-ST updates) | Sean Dobbs | |
CDC wire gains | Naomi Jarvis | 70000 - 71797 |
CDC overall gains | Naomi Jarvis | 71336 - 71557 |
CDC dE/dx | Naomi Jarvis | |
CDC time-to-distance | Naomi Jarvis | 71336 - 71557 |
PS/PSC Timing | Olga Cortes | |
TAGH timewalks | Olga Cortes | |
TAGM timewalks | Sean Dobbs/Richard Jones | |
TOF | Beni Zihlmann | |
DIRC | Justin Stevens |
Overall Calibrations
Calibration | Person | Status |
---|---|---|
BCAL channel timing | Mark Dalton | Done |
BCAL attenuation length/gain ratio | Mark Dalton | |
BCAL z-position | Mark Dalton | |
BCAL gains/non-linearities | Karthik Suresh | |
FCAL gains/non-linearities | Colin Gleason | |
FCAL timing | Colin Gleason | |
SC Timewalks | Rupesh Dotel | Done |
SC Propagation Time | Rupesh Dotel |
Reconstruction Checks
Need to verify that current reconstruction code is performing as well or better than what was used for 2018-01/2018-08-ver02
Analyses
Simulation
Quantity | Person | Run Range |
---|---|---|
CDC hit thresholds | Naomi Jarvis | 71336 - 71859 |
CDC wire mc efficiency | Naomi Jarvis | 70000 - 79999 (may need updates) |