2020 Data Production

From GlueXWiki
Revision as of 17:53, 10 February 2020 by Sdobbs (Talk | contribs) (Run-dependent Calibrations)

Jump to: navigation, search

Spring 2020 Dataset Summary

Proposed Schedule

Finalize Calibrations & Performing Monitoring Launch

  • Batch 1: April 1st
  • Batch 2: April 15st
  • Batch 3: ...

Ready for Production

  • Batch 1: May 1st
  • Batch 2: May 15st
  • Batch 3: ...

Run-dependent Calibrations

Calibration Person Run Range
Overall Timing (first pass) Sean Dobbs 71336 - 71557
Overall Timing (post-ST updates) Sean Dobbs
CDC wire gains Naomi Jarvis 70000 until electronics changes
CDC overall gains Naomi Jarvis 71336 - 71557
CDC dE/dx Naomi Jarvis
CDC time-to-distance Naomi Jarvis 71336 - 71557
PS/PSC Timing Olga Cortes
TAGH timewalks Olga Cortes
TAGM timewalks Sean Dobbs/Richard Jones
TOF Beni Zihlmann
DIRC Justin Stevens

Overall Calibrations

Calibration Person Status
BCAL channel timing Mark Dalton
BCAL attenuation length/gain ratio Mark Dalton
BCAL z-position Mark Dalton
BCAL gains/non-linearities Karthik Suresh
FCAL gains/non-linearities Colin Gleason
FCAL timing Colin Gleason
SC Timewalks Rupesh Dotel Done
SC Propagation Time Rupesh Dotel