2020 Data Production

From GlueXWiki
Revision as of 11:24, 21 April 2020 by Sdobbs (Talk | contribs) (Proposed Schedule)

Jump to: navigation, search

Spring 2020 Dataset Summary

Run Ranges

  • Batch 1: 71350 - 71591 (150/250 nA)
  • Batch 2: 71592 - 71727 (350 nA)
  • Batch 3: 71728 - 71855 (350 nA)
  • Batch 4: 71863 - 71942 (350 nA)
  • Batch 5: 71943 - 72067 (350 nA)
  • Batch 6: 72068 - 72163 (350 nA)
  • Batch 7: 72164 - 72325 (350 nA)
  • Batch 8: 72362 - 72435 (350 nA)

Proposed Schedule

Finalize Calibrations & Performing Monitoring Launch

  • Batch 1: April 3st
  • Batch 2: April 17st
  • Batch 3+4: May 1st
  • Batch 5+6: May 15th
  • Batch 7+8: May 29th

Ready for Production

  • Batch 1: May 15th
  • Batch 2: May 29th
  • Batch 3+4: June 12th
  • Batch 5+6: June 26th
  • Batch 7+8: July 10th

Run-dependent Calibrations

Calibration Person Run Range
Overall Timing (first pass) Sean Dobbs 71336 - 71557
Overall Timing (post-ST updates) Sean Dobbs 71336 - 71800
BCAL TDC 32 ns offsets Mark Dalton 71336 - 72438
BCAL run timing Mark Dalton 71336 - 71800 [1]
CDC wire gains Naomi Jarvis 70000 - 71797

71798 - 71859 71860 -

CDC overall gains Naomi Jarvis 71336 - 71800

except 71409 & 71754

CDC dE/dx Naomi Jarvis 71350 - 71800

except 71594, trigger test 71409 and empty target runs 71461, 71532, 71533

CDC time-to-distance Naomi Jarvis 71336 - 71800

except 71409 & 71754

CDC time-to-distance final pass Naomi Jarvis
PS/PSC Timing Olga Cortes 71336 - 71700
TAGH timewalks Olga Cortes 71336 - 71800 (some final checks underway)
TAGM timewalks Sean Dobbs/Richard Jones 71336 - 71800
TOF Beni Zihlmann 70000-71994
DIRC Justin Stevens 71366-71800

Overall Calibrations

Calibration Person Status
BCAL channel timing Mark Dalton Done
BCAL attenuation length/gain ratio Mark Dalton Done: Atten. Lengths, Gain Ratios
BCAL z-position Mark Dalton Done
BCAL gains/non-linearities Karthik Suresh Done Gains change
FCAL gains/non-linearities Colin Gleason Done
FCAL timing Colin Gleason Done
SC Timewalks Rupesh Dotel Done
SC Propagation Time Rupesh Dotel Done
Beam spot Simon Taylor Done
Beam energies Alexandre Deur Done
PS energy map Alex Somov
Beam current map David Lawrence

Reconstruction Checks

Need to verify that current reconstruction code is performing as well or better than what was used for 2018-01/2018-08-ver02

Reports

Analyses

Simulation

Quantity Person Run Range
CDC hit thresholds Naomi Jarvis 71336 - 71859
CDC wire mc efficiency Naomi Jarvis 70000 - 79999 (may need updates)