Difference between revisions of "2021-07-01"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Coordinates == The meeting will be on Thursday, June 17, 2021 at 11:00 AM EST. ==== Connecting ==== # To join via a Web Browser, go to the page [https://bluejeans...")
 
(Additional brief reports from working groups as needed)
Line 50: Line 50:
 
*** [[June_17,_2021_CPP_Design_Meeting | CPP Design Meeting, June 17]]
 
*** [[June_17,_2021_CPP_Design_Meeting | CPP Design Meeting, June 17]]
 
** Electronics and Firmware (Fernando)
 
** Electronics and Firmware (Fernando)
** Beamline Status:  [[BLTWG_Meeting_06/22/2021 | June 22, 2021]] (Richard)
+
** Beamline Status:  last meeting was [[BLTWG_Meeting_06/08/2021 | June 8, 2021]] (Richard)
** Tracking: [[Meetings-6-17-2021 | June 17, 2021]] (Naomi/Lubomir)
+
** Tracking: [[Tracking-6-17-2021 | June 17, 2021]] (Naomi/Lubomir)
 
** DIRC: [[June_25,_2021_DIRC | June 25, 2021]] (Justin)
 
** DIRC: [[June_25,_2021_DIRC | June 25, 2021]] (Justin)
 
** Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
 
** Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)

Revision as of 14:12, 30 June 2021

Meeting Coordinates

The meeting will be on Thursday, June 17, 2021 at 11:00 AM EST.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Start of Summer 2021 run is August 20 (Eugene)
    • DNP abstracts due today (Sean)
  2. Preparations for fall shifts (Reinhard)
  3. SAD work activities and planning (Tim and/or Fernando)
  4. Update on PrimEx preparations (Igal or Liping)
    • discussion of run plan on July 15
  5. Update on CPP and ERR follow-up (Elton)
  6. Update on GlueX-II production, calibration, and monitoring (Igal)
  7. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed