Difference between revisions of "2021-07-01"

From GlueXWiki
Jump to: navigation, search
(Additional brief reports from working groups as needed)
(Additional brief reports from working groups as needed)
Line 41: Line 41:
 
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/June_8,_2021,_Physics_Working_Group June 8, 2021] (Sean)
 
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/June_8,_2021,_Physics_Working_Group June 8, 2021] (Sean)
 
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_June_28,_2021 June 28, 2021] (Alex A.)
 
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_June_28,_2021 June 28, 2021] (Alex A.)
 +
** Pseudoscalar-vector PWA: [https://halldweb.jlab.org/wiki-private/index.php/Omega_Pi_PWA_Meeting_2021-06-29 June 29, 2021] (Justin/Zisis)
 
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/June_28,_2021,_Cross_Section_Working_Group June 28, 2021] (Justin)
 
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/June_28,_2021,_Cross_Section_Working_Group June 28, 2021] (Justin)
 
** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2021-06-21 June 21, 2020] (Zisis/Simon)
 
** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2021-06-21 June 21, 2020] (Zisis/Simon)

Revision as of 10:55, 1 July 2021

Meeting Coordinates

The meeting will be on Thursday, July 1, 2021 at 11:00 AM EST.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Start of Summer 2021 run is August 20 (Eugene)
    • DNP abstracts due today (Sean)
  2. Preparations for fall shifts (Reinhard)
  3. SAD work activities and planning (Tim and/or Fernando)
  4. Update on PrimEx preparations
    • discussion of run plan on July 15
  5. Update on CPP and ERR follow-up (Elton)
  6. Update on GlueX-II production, calibration, and monitoring (Alex or Sean)
  7. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed