Difference between revisions of "2021-08-26"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Coordinates == The meeting will be on Thursday, August 26, 2021 at 11:00 AM EST. ==== Connecting ==== # To join via a Web Browser, go to the page [https://bluejea...")
 
Line 16: Line 16:
 
# Announcements
 
# Announcements
 
#* Start of run is September 4 (Eugene)
 
#* Start of run is September 4 (Eugene)
#* September Collaboration meeting 9/22 - 9/24 will be online
+
#* September Collaboration meeting 9/22 - 9/24 will be online:  [https://misportal.jlab.org/Ul/conferences/generic_conference/registration.cfm?conference_id=COLLAB-GLUEX-SEP21 please register]
 
# PrimEx run preparations (Sasha)
 
# PrimEx run preparations (Sasha)
 
#*  [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Summer2021  Run Coordination Meetings (Summer 2021)]
 
#*  [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Summer2021  Run Coordination Meetings (Summer 2021)]
Line 23: Line 23:
 
#* [https://forms.gle/WSYJXiRZsdqg3Eci7 Required Reading for Remote Shifters]
 
#* [https://forms.gle/WSYJXiRZsdqg3Eci7 Required Reading for Remote Shifters]
 
#* remote shift connection demonstration planned for Thursday, Sept. 2 at 11A  (Beni/Matt)
 
#* remote shift connection demonstration planned for Thursday, Sept. 2 at 11A  (Beni/Matt)
#* local experts are encouraged to sign up for the [https://mailman.jlab.org/mailman/listinfo/Gluex_shift_standby gluex_shift_standby mailing list]
+
#* local experts are encouraged to sign up for the [https://mailman.jlab.org/mailman/listinfo/Gluex_shift_standby gluex_shift_standby mailing list] (Naomi)
 
# Update on CPP (Elton)
 
# Update on CPP (Elton)
 
# Update on GlueX-II production, calibration, and monitoring (Igal)
 
# Update on GlueX-II production, calibration, and monitoring (Igal)
Line 36: Line 36:
  
 
* Software and Analysis
 
* Software and Analysis
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/August_11,_2021,_Analysis_Working_Group August 11, 2021] (Alex)
+
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/August_25,_2021,_Analysis_Working_Group August 25, 2021] (Alex)
** Offline Meeting:  last meet [[GlueX_Software_Meeting,_July_20,_2021 | July 20, 2021]] (Mark)
+
** Offline Meeting:  last meet [[GlueX_Software_Meeting,_August_17,_2021 | August 17, 2021]] (Mark)
*** [https://markito3.wordpress.com/2021/08/11/gluex-meeting-report-august-12-2021/ Mark's Notes]
+
** Particle ID Working Group: [[GlueX_PID_Meeting,_August_24,_2021 | August 24, 2021]] (Simon)
** Particle ID Working Group: last meeting was [[GlueX_PID_Meeting,_August_10,_2021 | August 10, 2021]] (Simon)
+
  
 
* Topical meetings
 
* Topical meetings
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/July_20,_2021,_Physics_Working_Group July 20, 2021] (Sean)
+
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/August_17,_2021,_Physics_Working_Group August 17, 2021] (Sean)
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_August_9,_2021 August 9, 2021] (Alex A.)
+
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_August_23,_2021 August 23, 2021] (Alex A.)
** Pseudoscalar-vector PWA: [https://halldweb.jlab.org/wiki-private/index.php/Omega_Pi_PWA_Meeting_2021-08-10 August 10, 2021] (Justin/Zisis)
+
** Pseudoscalar-vector PWA: [https://halldweb.jlab.org/wiki-private/index.php/Omega_Pi_PWA_Meeting_2021-08-24 August 24, 2021] (Justin/Zisis)
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/August_9,_2021,_Cross_Section_Working_Group August 9, 2021] (Justin)
+
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/August_23,_2021,_Cross_Section_Working_Group August 23, 2021] (Justin)
** Beam Asymmetry Working Group: last meeting was [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2021-08-02 August 2, 2020] (Zisis/Simon)
+
** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2021-08-16 August 16, 2020] (Zisis/Simon)
** PrimEx Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/August_6,_2021_PrimEx-Eta_Meeting August 6, 2021] (Sasha)
+
** PrimEx Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/August_20,_2021_PrimEx-Eta_Meeting August 20, 2021] (Sasha)
** Di-lepton/Rare Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_July_22,_2021 July 22, 2021] (Sean/Lubomir)
+
** Di-lepton/Rare Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_August_19,_2021 August 19, 2021] (Sean/Lubomir)
** JEF:  [[JEF_meeting,_August_6,_2021 | August 6, 2021]] (Simon/Liping/Sasha/Zisis)  
+
** JEF:  [[JEF_meeting,_August_20,_2021 | August 20, 2021]] (Simon/Liping/Sasha/Zisis)  
  
 
* Hardware Working Groups:
 
* Hardware Working Groups:

Revision as of 12:35, 25 August 2021

Meeting Coordinates

The meeting will be on Thursday, August 26, 2021 at 11:00 AM EST.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Start of run is September 4 (Eugene)
    • September Collaboration meeting 9/22 - 9/24 will be online: please register
  2. PrimEx run preparations (Sasha)
  3. Hall and hot checkout status (Tim)
  4. Shift Issues
  5. Update on CPP (Elton)
  6. Update on GlueX-II production, calibration, and monitoring (Igal)
  7. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed