Difference between revisions of "2021-09-09"
From GlueXWiki
(→Agenda) |
|||
Line 48: | Line 48: | ||
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/August_31,_2021,_Physics_Working_Group August 31, 2021] (Sean) | ** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/August_31,_2021,_Physics_Working_Group August 31, 2021] (Sean) | ||
** Amplitude Analysis Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_September_7,_2021 September 7, 2021] (Alex A.) | ** Amplitude Analysis Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_September_7,_2021 September 7, 2021] (Alex A.) | ||
− | ** Pseudoscalar-vector PWA: [https://halldweb.jlab.org/wiki-private/index.php/ | + | ** Pseudoscalar-vector PWA: [https://halldweb.jlab.org/wiki-private/index.php/Vector_Pseudoscalar_PWA_Meeting_2021-09-07 September 7, 2021] (Justin/Zisis) |
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/September_7,_2021,_Cross_Section_Working_Group September 7, 2021] (Justin) | ** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/September_7,_2021,_Cross_Section_Working_Group September 7, 2021] (Justin) | ||
** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2021-08-30 August 30, 2020] (Zisis/Simon) | ** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2021-08-30 August 30, 2020] (Zisis/Simon) |
Latest revision as of 10:53, 9 September 2021
Contents
Meeting Coordinates
The meeting will be on Thursday, September 9, 2021 at 11:00 AM EST.
Connecting
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- September Collaboration meeting 9/22 - 9/24 will be online: please register
- Student Flash Session on the morning of Wednesday, 9/22: send contributions to Rebecca Barsotti (rebars at iu.edu)
- Updates on lab access (Eugene)
- Start of run is planned for Swing Shift on Monday September 13 (Mark D)
- Hall D status (Tim)
- PrimEx run plan and startup (Sasha)
- Preparations for Shifts
- Required Reading for Remote Shifters
- Instructions for Remote Shifters
- local experts are encouraged to sign up for the gluex_shift_standby mailing list (Naomi)
- Proposed Management Plan changes concerning Diversity and Inclusion (Draft/Comments) (Talk) (Naomi/Reinhard)
- Update on CPP (Elton)
- Update on GlueX-II production, calibration, and monitoring (Igal)
- Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
- TAGH calibration, PS calibration, hardware maintenance, etc.
- Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
- maintenance of kinematic fitting framework
- Development of offsite data processing systems
- Maintenance of online monitoring tools (rootspy or full transition to hydra)
Additional brief reports from working groups as needed
- Software and Analysis
- Production and Analysis Working Group: September 8, 2021 (Alex)
- Offline Meeting: August 31, 2021 (Mark)
- Particle ID Working Group: last meeting was August 24, 2021 (Simon)
- Topical meetings
- Physics Working Group: August 31, 2021 (Sean)
- Amplitude Analysis Working Group: September 7, 2021 (Alex A.)
- Pseudoscalar-vector PWA: September 7, 2021 (Justin/Zisis)
- Cross-section Working Group: September 7, 2021 (Justin)
- Beam Asymmetry Working Group: August 30, 2020 (Zisis/Simon)
- PrimEx Working Group: September 3, 2021 (Sasha)
- Di-lepton/Rare Working Group: last meeting was August 19, 2021 (Sean/Lubomir)
- JEF: September 3, 2021 (Simon/Liping/Sasha/Zisis)
- Hardware Working Groups:
- Engineering Activities: FCAL-II, CPP, other (Tim)
- Electronics and Firmware (Fernando)
- Beamline Status: August 31, 2021 (Richard)
- Tracking: September 2, 2021 (Naomi/Lubomir)
- DIRC: September 3, 2021 (Justin)
- Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
- Trigger (Sasha)
- Calorimetry: September 1, 2021 (Zisis/Mark)
- Start Counter: September 2, 2021 (Mark I.)
- TOF: last meeting was August 25, 2021 (Mark I.)