Difference between revisions of "2021-10-21"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 38: Line 38:
  
 
* Software and Analysis
 
* Software and Analysis
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/September_8,_2021,_Analysis_Working_Group September 8, 2021] (Alex)
+
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/October_20,_2021,_Analysis_Working_Group September 8, 2021] (Alex)
** Offline Meeting:  [[GlueX_Software_Meeting,_August_31,_2021 | August 31, 2021]] (Mark)
+
** Offline Meeting:  [[GlueX_Software_Meeting,_October_11,_2021 | October 11, 2021]] (Mark)
*** [https://markito3.wordpress.com/2021/09/09/gluex-meeting-report-september-9-2021/ Mark's Notes]
+
** Particle ID Working Group: last meeting was [[GlueX_PID_Meeting,_October_19,_2021 | October 19, 2021]] (Simon)
** Particle ID Working Group: last meeting was [[GlueX_PID_Meeting,_August_24,_2021 | August 24, 2021]] (Simon)
+
  
 
* Topical meetings
 
* Topical meetings
 
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/August_31,_2021,_Physics_Working_Group August 31, 2021] (Sean)
 
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/August_31,_2021,_Physics_Working_Group August 31, 2021] (Sean)
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_September_7,_2021 September 7, 2021] (Alex A.)
+
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_October_18,_2021 October 18, 2021] (Alex A.)
** Pseudoscalar-vector PWA: [https://halldweb.jlab.org/wiki-private/index.php/Vector_Pseudoscalar_PWA_Meeting_2021-09-07 September 7, 2021] (Justin/Zisis)
+
** Pseudoscalar-vector PWA: [https://halldweb.jlab.org/wiki-private/index.php/Vector_Pseudoscalar_PWA_Meeting_2021-10-19 October 19, 2021] (Justin/Zisis)
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/September_7,_2021,_Cross_Section_Working_Group September 7, 2021] (Justin)
+
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/October_18,_2021,_Cross_Section_Working_Group October 18, 2021] (Justin)
** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2021-08-30 August 30, 2020] (Zisis/Simon)
+
** Beam Asymmetry Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Beam_Asymmetry_Meeting_2021-09-27 September 27, 2020] (Zisis/Simon)
** PrimEx Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/September_3,_2021_PrimEx-Eta_Meeting September 3, 2021] (Sasha)
+
** PrimEx Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/October_15,_2021_PrimEx-Eta_Meeting October 15, 2021] (Sasha)
** Di-lepton/Rare Working Group: last meeting was [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_August_19,_2021 August 19, 2021] (Sean/Lubomir)
+
** Di-lepton/Rare Working Group: last meeting [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_September_16,_2021 September 16, 2021] (Sean/Lubomir)
** JEF:  [[JEF_meeting,_September_3,_2021 | September 3, 2021]] (Simon/Liping/Sasha/Zisis)  
+
** JEF:  [[JEF_meeting,_October_15,_2021 | October 15, 2021]] (Simon/Liping/Sasha/Zisis)  
  
 
* Hardware Working Groups:
 
* Hardware Working Groups:
 
** Engineering Activities:  FCAL-II, CPP, other (Tim)  
 
** Engineering Activities:  FCAL-II, CPP, other (Tim)  
*** [[August_26,_2021_CPP_Design_Meeting | CPP Design Meeting, August 26]]
+
*** [[September_09,_2021_CPP_Design_Meeting | CPP Design Meeting, September 9]]
 
** Electronics and Firmware (Fernando)
 
** Electronics and Firmware (Fernando)
** Beamline Status:  [[BLTWG_Meeting_08/31/2021 | August 31, 2021]] (Richard)
+
** Beamline Status:  [[BLTWG_Meeting_10/12/2021 | October 12, 2021]] (Richard)
** Tracking: [[Tracking-9-2-2021 | September 2, 2021]] (Naomi/Lubomir)
+
** Tracking: [[Tracking-10-7-2021 | October 7, 2021]] (Naomi/Lubomir)
** DIRC: [[September_3,_2021_DIRC | September 3, 2021]] (Justin)
+
** DIRC: [[October_1,_2021_DIRC | October 1, 2021]] (Justin)
 
** Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
 
** Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
 
** Trigger (Sasha)
 
** Trigger (Sasha)
** Calorimetry: [[September_1,_2021_Calorimeter | September 1, 2021]] (Zisis/Mark)
+
** Calorimetry: [[October_13,_2021_Calorimeter | October 13, 2021]] (Zisis/Mark)
** Start Counter: [[GlueX_Start_Counter_Meeting,_September_2,_2021 | September 2, 2021]] (Mark I.)
+
** Start Counter: [[GlueX_Start_Counter_Meeting,_October_14,_2021 | October 14, 2021]] (Mark I.)
** TOF: last meeting was [[GlueX_TOF_Meeting,_August_25,_2021 | August 25, 2021]] (Mark I.)
+
** TOF: [[GlueX_TOF_Meeting,_October_6,_2021 | October 6, 2021]] (Mark I.)

Revision as of 17:44, 20 October 2021

Meeting Coordinates

The meeting will be on Thursday, October 21, 2021 at 11:00 AM EST.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Updates on lab access (Eugene)
  3. Hall D equipment status (Tim)
  4. Update on PrimEx running (Sasha)
  5. Reminders for Shift Workers
  6. Update on CPP (Elton)
  7. Update on GlueX-II production (Igal)
  8. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed