Difference between revisions of "2022-01-27"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(5 intermediate revisions by 3 users not shown)
Line 50: Line 50:
 
# CPP Installation Status Report (Rory and Tim)
 
# CPP Installation Status Report (Rory and Tim)
 
#* [[January_13,_2022_CPP_Design/Install_Meeting | CPP Design/Install Meeting, January 13]]
 
#* [[January_13,_2022_CPP_Design/Install_Meeting | CPP Design/Install Meeting, January 13]]
# Summary of the Software Review (Mark I.)
+
# [[Software and Computing Review 6|Summary of the Software Review]] (Mark I.)
 +
# Summary of [https://halldweb.jlab.org/wiki-private/index.php/January_2022_Amplitude_Analysis_Workshop Amplitude Analysis Workfest] (Justin)
 
# Software Documentation Effort (Beni)
 
# Software Documentation Effort (Beni)
 
#* [https://halldweb.jlab.org/wiki/index.php/Software software landing page] on wiki  
 
#* [https://halldweb.jlab.org/wiki/index.php/Software software landing page] on wiki  
 
# PrimEx calibration, monitoring, skim processing (Sasha/Igal)
 
# PrimEx calibration, monitoring, skim processing (Sasha/Igal)
# Update on GlueX analysis launches
+
# Update on GlueX-II analysis
 
#* relaunch and TOF bug (Alex)
 
#* relaunch and TOF bug (Alex)
 
#* analysis on the OSG (Sean)
 
#* analysis on the OSG (Sean)
Line 69: Line 70:
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/January_26,_2022,_Analysis_Working_Group January 26, 2022] (Alex)
 
** Production and Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/January_26,_2022,_Analysis_Working_Group January 26, 2022] (Alex)
 
** Offline Meeting:  [[GlueX_Software_Meeting,_January_18,_2022 | January 18, 2022]] (Mark)
 
** Offline Meeting:  [[GlueX_Software_Meeting,_January_18,_2022 | January 18, 2022]] (Mark)
 +
*** [https://markito3.wordpress.com/2022/01/26/gluex-meeting-report-january-27-2022/ Mark's Notes]
 
** Particle ID Working Group:  [[GlueX_PID_Meeting,_January_25,_2022 | January 25, 2022]] (Simon)
 
** Particle ID Working Group:  [[GlueX_PID_Meeting,_January_25,_2022 | January 25, 2022]] (Simon)
  
 
* Topical Meetings
 
* Topical Meetings
 
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Jan_18,_2022,_Physics_Working_Group January 18, 2022] (Sean)
 
** Physics Working Group: [https://halldweb.jlab.org/wiki-private/index.php/Jan_18,_2022,_Physics_Working_Group January 18, 2022] (Sean)
 +
*** [https://halldweb.jlab.org/wiki-private/index.php/GlueX_April_APS_2022 April APS Meeting preparation]
 
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_January_24,_2022 January 24, 2022] (Alex A.)
 
** Amplitude Analysis Working Group:  [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_January_24,_2022 January 24, 2022] (Alex A.)
 
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/January_24,_2022,_Cross_Section_Working_Group January 24, 2022] (Justin)
 
** Cross-section Working Group: [https://halldweb.jlab.org/wiki-private/index.php/January_24,_2022,_Cross_Section_Working_Group January 24, 2022] (Justin)

Latest revision as of 12:08, 27 January 2022

Meeting Coordinates

The meeting will be on Thursday, January 27, 2022 at 11:00 AM EST.

Connecting

Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1601990060 (Click "Expand" to the right for more details -->):

Meeting ID: 160 199 0060 Passcode: 8394

One tap mobile

+16692545252,,1608686187# US (San Jose)
+16468287666,,1608686187# US (New York)

Dial by your location

+1 669 254 5252 US (San Jose)
+1 646 828 7666 US (New York)
+1 669 216 1590 US (San Jose)
+1 551 285 1373 US
   833 568 8864 US Toll-free

Meeting ID: 160 868 6187

Find your local number: https://jlab-org.zoomgov.com/u/akv0IBrQk

Join by SIP

11601990060@sip.zoomgov.com

Join by H.323 (Polycom)

161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 199 0060
Passcode: 8394

Agenda

  1. Announcements
  2. Updates on Lab Access (Eugene)
  3. Plan for February Collaboration Meeting (Matt)
    • February 23-25 hybrid meeting with in-person participation at Florida State University
    • dedicated session on GlueX Detector Lifetime Evaluation; input from working groups is needed
  4. CPP Installation Status Report (Rory and Tim)
  5. Summary of the Software Review (Mark I.)
  6. Summary of Amplitude Analysis Workfest (Justin)
  7. Software Documentation Effort (Beni)
  8. PrimEx calibration, monitoring, skim processing (Sasha/Igal)
  9. Update on GlueX-II analysis
    • relaunch and TOF bug (Alex)
    • analysis on the OSG (Sean)
    • status of GlueX-II simulations (Alex/Sean)
  10. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed