Difference between revisions of "2022-08-11"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 55: Line 55:
 
# CPP run report (Rory)
 
# CPP run report (Rory)
 
# Run and Shift Preparations
 
# Run and Shift Preparations
#* CPP -> PrimEx reconfiguration Aug 18 - 26
+
#* CPP -> PrimEx reconfiguration Aug 18 - 26 (Tim)
 
#* PrimEx runs to December shutdown
 
#* PrimEx runs to December shutdown
 
#* Current [https://www.jlab.org/sites/default/files/user-liaison/files/Scheduing-Memo-20220724.pdf Experiment Schedule]
 
#* Current [https://www.jlab.org/sites/default/files/user-liaison/files/Scheduing-Memo-20220724.pdf Experiment Schedule]

Revision as of 14:49, 10 August 2022

Meeting Coordinates

The meeting will be on Thursday, August 11, 2022 at 11:00 AM ET. For those in-person at JLab F326 is reserved

Connecting

Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1601990060 (Click "Expand" to the right for more details -->):

Meeting ID: 160 199 0060 Passcode: 8394

One tap mobile

+16692545252,,1608686187# US (San Jose)
+16468287666,,1608686187# US (New York)

Dial by your location

+1 669 254 5252 US (San Jose)
+1 646 828 7666 US (New York)
+1 669 216 1590 US (San Jose)
+1 551 285 1373 US
   833 568 8864 US Toll-free

Meeting ID: 160 199 0060

Find your local number: https://jlab-org.zoomgov.com/u/akv0IBrQk

Join by SIP

11601990060@sip.zoomgov.com

Join by H.323 (Polycom)

161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 199 0060
Passcode: 8394

When joining with a PolyCom unit you will be muted on entry. Press 1 on the remote to open the menu, and then 2 will unmute the microphone.

Agenda

  1. Announcements
  2. GlueX Collaboration Meeting Planning (Matt)
    • September 21 (afternoon) - September 23
    • Five-minute flash talks on the morning of September 21 ?
    • Tentative for 2023: February 15 - 17
  3. Report from JLab Science and Technology Review (Eugene)
    • Recommendation: "Work with the GlueX collaboration towards the timely publication of results on exotic meson spectroscopy. Report on progress to NP by January 2023."
  4. CPP run report (Rory)
  5. Run and Shift Preparations
    • CPP -> PrimEx reconfiguration Aug 18 - 26 (Tim)
    • PrimEx runs to December shutdown
    • Current Experiment Schedule
  6. Updates on summer publication targets: J/ψ, ρ SDME, and σ(η) (Lubomir, Alex, Jon/Daniel)
  7. Software Documentation Effort (Beni)
  8. PrimEx calibration, monitoring, skim processing (Mariana/Igal)
  9. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, PS calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
      • maintenance of kinematic fitting framework

Additional brief reports from working groups as needed

  • Software and Analysis