Revision history of "Addressing ERR review recommendations"

From GlueXWiki
Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)
  • (cur | prev) 08:43, 28 June 2018Jrsteven (Talk | contribs). . (3,311 bytes) (+271). . (Charge 5: Are the responsibilities for carrying out each job identified, and are the manpower and other resources necessary to complete them on time in place?)
  • (cur | prev) 13:44, 26 June 2018Jrsteven (Talk | contribs). . (3,040 bytes) (+66)
  • (cur | prev) 13:43, 26 June 2018Jrsteven (Talk | contribs). . (2,974 bytes) (+4). . (Charge 6: Are the specific documentation and procedures to operate safely and efficiently the detector, in place and adequate? This includes initial operation.)
  • (cur | prev) 13:43, 26 June 2018Jrsteven (Talk | contribs). . (2,970 bytes) (+3). . (Charge 6: Are the specific documentation and procedures to operate safely and efficiently the detector, in place and adequate? This includes initial operation.)
  • (cur | prev) 13:43, 26 June 2018Jrsteven (Talk | contribs). . (2,967 bytes) (-2). . (Charge 2: Has the detector been completed, commissioned and ready to operate? If not, what are the completion/commissioning schedule and tasks?)
  • (cur | prev) 13:42, 26 June 2018Jrsteven (Talk | contribs). . (2,969 bytes) (+2,969). . (Created page with " == Charge 2: Has the detector been completed, commissioned and ready to operate? If not, what are the completion/commissioning schedule and tasks? == *Recommendation 1: The...")
(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)