this is a reminder for today's teleconference regarding the BCAL beam tests at Hall-B at 12:30 EDT.
 
this is a reminder for today's teleconference regarding the BCAL beam tests at Hall-B at 12:30 EDT.
  
Connection
+
'''Connection'''
 
----------------
 
----------------
  
Line 9: Line 9:
 
Participants' code 2805258
 
Participants' code 2805258
  
Agenda
+
'''Agenda'''
 
-----------
 
-----------
  
1. Detector Setup/Mechanics
+
# Detector Setup/Mechanics
- Status Quo (Indiana, Regina, CMU, JLab)
+
#* Status Quo (Indiana, Regina, CMU, JLab)
- assembly, testing, calibration location (Regina or JLab?)
+
#* assembly, testing, calibration location (Regina or JLab?)
- beam profile monitor in Hall-B
+
#* beam profile monitor in Hall-B
- CLAS work schedule (see Appendix A below)
+
#* CLAS work schedule (see Appendix A below)
 +
# DAQ/Electronics
 +
#* Status Quo
 +
#* Tagger counters in trigger and timing vs RF? T-counters in bucket?
 +
#* F1 TDCs and CAEN 792 ADCs; purchase 64X crate
 +
# Online software
 +
#* Coda/Coda-lite update
 +
#* data stream (format, silo, gridftp)
 +
#* Wiki, e-log
 +
#* online macros/checks (PAW, ROOT?)
 +
# Monte Carlo
 +
#* Status Quo
 +
#* output format/data stream/macro type
 +
#* validation (tagger energy binning, digitization)
 +
# Offline analysis
 +
#* standalone vs DANA
 +
# Any other business
  
2. DAQ/Electronics
 
- Status Quo
 
- Tagger counters in trigger and timing vs RF? T-counters in bucket?
 
- F1 TDCs and CAEN 792 ADCs; purchase 64X crate
 
  
3. Online software
+
Talk to you later, Zisis...
- Coda/Coda-lite update
+
- data stream (format, silo, gridftp)
+
- Wiki, e-log
+
- online macros/checks (PAW, ROOT?)
+
  
4. Monte Carlo
 
- Status Quo
 
- output format/data stream/macro type
 
- validation (tagger energy binning, digitization)
 
  
5. Offline analysis
+
'''Appendix A - Current CLAS Hall Work Schedule'''
- standalone vs DANA
+
  
6. Any other business
+
From Elliott; see:
 +
http://clasweb.jlab.org/engineering/schedules/Summer_2006_Opening.2.html
  
 +
Item 137 concerns installation of the GlueX calorimeter, 2.5 days, 16-Aug.  Some of the items 138-144 concern GlueX as well.  I do not fully understand this list, as I do not see anything before installation of the calorimeter related to the platform, although perhaps item 137 includes the platform.  Doug tells me the platform is near completion.
  
Talk to you later, Zisis...
+
Note that during the summer the alcove will be completely cleared out (RadPhi calorimeter housing, etc.).  The pie tower electronics racks will also be emptied but the racks will remain.  Not sure about the cabinets...I think they should remain...I'll contact Doug...

Revision as of 10:54, 19 May 2006

Hi folks:

this is a reminder for today's teleconference regarding the BCAL beam tests at Hall-B at 12:30 EDT.

Connection


Call (306) 781-5999 Participants' code 2805258

Agenda


  1. Detector Setup/Mechanics
    • Status Quo (Indiana, Regina, CMU, JLab)
    • assembly, testing, calibration location (Regina or JLab?)
    • beam profile monitor in Hall-B
    • CLAS work schedule (see Appendix A below)
  2. DAQ/Electronics
    • Status Quo
    • Tagger counters in trigger and timing vs RF? T-counters in bucket?
    • F1 TDCs and CAEN 792 ADCs; purchase 64X crate
  3. Online software
    • Coda/Coda-lite update
    • data stream (format, silo, gridftp)
    • Wiki, e-log
    • online macros/checks (PAW, ROOT?)
  4. Monte Carlo
    • Status Quo
    • output format/data stream/macro type
    • validation (tagger energy binning, digitization)
  5. Offline analysis
    • standalone vs DANA
  6. Any other business


Talk to you later, Zisis...


Appendix A - Current CLAS Hall Work Schedule

From Elliott; see: http://clasweb.jlab.org/engineering/schedules/Summer_2006_Opening.2.html

Item 137 concerns installation of the GlueX calorimeter, 2.5 days, 16-Aug. Some of the items 138-144 concern GlueX as well. I do not fully understand this list, as I do not see anything before installation of the calorimeter related to the platform, although perhaps item 137 includes the platform. Doug tells me the platform is near completion.

Note that during the summer the alcove will be completely cleared out (RadPhi calorimeter housing, etc.). The pie tower electronics racks will also be emptied but the racks will remain. Not sure about the cabinets...I think they should remain...I'll contact Doug...