Difference between revisions of "Analysis Plan"

From GlueXWiki
Jump to: navigation, search
Line 9: Line 9:
 
#*Gain calibration
 
#*Gain calibration
 
#*Nonlinear energy correction
 
#*Nonlinear energy correction
 +
  
 
----
 
----
Line 20: Line 21:
 
#*Can use pi0s at larger angles and extrapolate to forward-angles
 
#*Can use pi0s at larger angles and extrapolate to forward-angles
 
#''Matching of detector response in Data/Simulation'' (Igal)
 
#''Matching of detector response in Data/Simulation'' (Igal)
 +
  
 
----
 
----

Revision as of 13:58, 19 November 2021

Calibration Tasks

  1. Tagger (Tyler)
  2. FCAL (Igal)
  3. CCAL (Drew)
    • Timing offsets
    • Timewalk calibration
    • Gain calibration
    • Nonlinear energy correction



General Analysis Tasks

  1. Alignment of detectors/beam. (Drew, 1 week)
    • Compton on inner part of FCAL to align FCAL with beam.
    • Use single-arm Compton scattering to align CCAL with beam.
  2. Determine angular resolution of two-photon pairs. (Tyler)
    • Study how the resolution changes with energy and scattering angle
    • Can use pi0s at larger angles and extrapolate to forward-angles
  3. Matching of detector response in Data/Simulation (Igal)



Compton Analysis (Drew)

  1. Perform simulations for 2021 data set.
    • Simulate both Compton (signal) and Pair production (background) in hdgeant4
    • May need separate simulations for each run period to account changes in run conditions.
  2. Determine optimal cut widths for each cut parameter (deltaE, deltaPhi, etc.)
  3. Measure cross section for small run periods
  4. Systematics study