Difference between revisions of "Analysis Shift Meeting Agenda, November 14 - November 20, 2021"

From GlueXWiki
Jump to: navigation, search
(Sunday, November 14,)
(Thursday, November 18)
 
(34 intermediate revisions by 4 users not shown)
Line 1: Line 1:
= Sunday, November 14, =
+
===Daily Analysis meeting at 2pm EST (CC room 326) [https://bluejeans.com/773909590/1171 BlueJeans Link]===
 +
 
 +
= Friday, November 19 =
 +
# Status of the run (Bo)
 +
##Run 90034 (Nov 8 22:35) to Run 90185 (Nov 19 06:49)
 +
##In total: 152 runs, 224 hours
 +
##Production: 116 runs, 177 hours, 13160 EVIO files, 22.1B triggers
 +
##Data quality checked until run 90157
 +
##Physics analyzed until run 90135, 1288 EVIO files (9.5%)
 +
##Calibration: tagger microscope calibrated until 90100
 +
# [https://halldweb.jlab.org/wiki/images/8/84/20211119_schmidt.pdf Rate estimates for color transparency] (Axel)
 +
# Analysis update (Jackson)
 +
# PID with CDC (Nathaly)
 +
 
 +
= Thursday, November 18=
 +
# Compton Updates from PrimeX (Drew)
 +
# Proposal estimates update (Axel) [[Media:20211118_schmidt.pdf ]]
 +
# Color transparency  estimates (Holly) [[Media:Ct_thoughts_18nov21.pdf]]
 +
# 2p1pi1pi0 results (Jackson) [https://halldweb.jlab.org/wiki/images/5/53/Preliminary_2p1p1pi0.pdf]
 +
 
 +
=Wednesday, November 17 =
 +
* Update: No beam for the last 5 hours
 +
# Data collected so far (Bo)
 +
## Liquid He-4 target
 +
## 1st production run: 90034 (Nov. 8 at 22:35)
 +
## As of now, 90166 (Nov. 17 8:47)
 +
## In total: 133 runs, 202 hours
 +
## Production: 98 runs, 149 hours, 10727 evio Files
 +
## Analyzed: 69 runs, 524 evio files
 +
# Monitoring update (Phoebe)
 +
# Flux Update (Phoebe)
 +
# Rho minus analysis update (Jackson)
 +
# Rho 0 analysis update (Nathaly)
 +
# Discussion
 +
 
 +
= Tuesday, November 16 =
 +
# Physics Update
 +
# Run Plan Discussion
 +
# Calibration Update
 +
 
 +
= Monday, November 15 =
 +
# Run Plan Update (Axel) [[Media:20211115_schmidt.pdf]]
 +
## Draft schedule (fixed) [[Media:Runplan_draft_20211115.pdf]]
 +
## [https://docs.google.com/spreadsheets/d/1sSZwZjhfH3IfXumqIqM1x6Sg632ZtCq_IVNUGGL3Ia4/edit?usp=sharing Link to google doc (will change)]
 +
# Physics Monitoring (Jackson)
 +
# TAGM Update
 +
# Updating Radiator Reminder
 +
 
 +
= Sunday, November 14 =
 
# Production Update
 
# Production Update
 +
# Plot
 +
## Recon. Num. High-Level Objects: Missing Roc
 +
## Recon. FCAL 2
 +
## Updated Golden Run to 90091
 +
# Calibration Plan Update
 +
## TAGM
 +
## TAGH
 +
## PS
 +
# Flux
 +
## pi0/rho0?
 +
### considering background subtraction
 +
## omega 0/ rho0
 +
## TAG and PS (in progress)

Latest revision as of 16:34, 19 November 2021

Daily Analysis meeting at 2pm EST (CC room 326) BlueJeans Link

Friday, November 19

  1. Status of the run (Bo)
    1. Run 90034 (Nov 8 22:35) to Run 90185 (Nov 19 06:49)
    2. In total: 152 runs, 224 hours
    3. Production: 116 runs, 177 hours, 13160 EVIO files, 22.1B triggers
    4. Data quality checked until run 90157
    5. Physics analyzed until run 90135, 1288 EVIO files (9.5%)
    6. Calibration: tagger microscope calibrated until 90100
  2. Rate estimates for color transparency (Axel)
  3. Analysis update (Jackson)
  4. PID with CDC (Nathaly)

Thursday, November 18

  1. Compton Updates from PrimeX (Drew)
  2. Proposal estimates update (Axel) Media:20211118_schmidt.pdf
  3. Color transparency estimates (Holly) Media:Ct_thoughts_18nov21.pdf
  4. 2p1pi1pi0 results (Jackson) [1]

Wednesday, November 17

  • Update: No beam for the last 5 hours
  1. Data collected so far (Bo)
    1. Liquid He-4 target
    2. 1st production run: 90034 (Nov. 8 at 22:35)
    3. As of now, 90166 (Nov. 17 8:47)
    4. In total: 133 runs, 202 hours
    5. Production: 98 runs, 149 hours, 10727 evio Files
    6. Analyzed: 69 runs, 524 evio files
  2. Monitoring update (Phoebe)
  3. Flux Update (Phoebe)
  4. Rho minus analysis update (Jackson)
  5. Rho 0 analysis update (Nathaly)
  6. Discussion

Tuesday, November 16

  1. Physics Update
  2. Run Plan Discussion
  3. Calibration Update

Monday, November 15

  1. Run Plan Update (Axel) Media:20211115_schmidt.pdf
    1. Draft schedule (fixed) Media:Runplan_draft_20211115.pdf
    2. Link to google doc (will change)
  2. Physics Monitoring (Jackson)
  3. TAGM Update
  4. Updating Radiator Reminder

Sunday, November 14

  1. Production Update
  2. Plot
    1. Recon. Num. High-Level Objects: Missing Roc
    2. Recon. FCAL 2
    3. Updated Golden Run to 90091
  3. Calibration Plan Update
    1. TAGM
    2. TAGH
    3. PS
  4. Flux
    1. pi0/rho0?
      1. considering background subtraction
    2. omega 0/ rho0
    3. TAG and PS (in progress)