Analysis Shift Meeting Agenda, November 14 - November 20, 2021

From GlueXWiki
Revision as of 17:45, 17 November 2021 by Psharp (Talk | contribs)

Jump to: navigation, search

Daily Analysis meeting at 2pm EST (CC room 326) BlueJeans Link

Thursday, November 18

  1. Compton Updates from PrimeX (Drew)

Wednesday, November 17

  • Update: No beam for the last 5 hours
  1. Data collected so far (Bo)
    1. Liquid He-4 target
    2. 1st production run: 90034 (Nov. 8 at 22:35)
    3. As of now, 90166 (Nov. 17 8:47)
    4. In total: 133 runs, 202 hours
    5. Production: 98 runs, 149 hours, 10727 evio Files
    6. Analyzed: 69 runs, 524 evio files
  2. Monitoring update (Phoebe)
  3. Flux Update (Phoebe)
  4. Rho minus analysis update (Jackson)
  5. Rho 0 analysis update (Nathaly)
  6. Discussion

Tuesday, November 16

  1. Physics Update
  2. Run Plan Discussion
  3. Calibration Update

Monday, November 15

  1. Run Plan Update (Axel) Media:20211115_schmidt.pdf
    1. Draft schedule (fixed) Media:Runplan_draft_20211115.pdf
    2. Link to google doc (will change)
  2. Physics Monitoring (Jackson)
  3. TAGM Update
  4. Updating Radiator Reminder

Sunday, November 14,

  1. Production Update
  2. Plot
    1. Recon. Num. High-Level Objects: Missing Roc
    2. Recon. FCAL 2
    3. Updated Golden Run to 90091
  3. Calibration Plan Update
    1. TAGM
    2. TAGH
    3. PS
  4. Flux
    1. pi0/rho0?
      1. considering background subtraction
    2. omega 0/ rho0
    3. TAG and PS (in progress)