Difference between revisions of "Analysis Shift Meeting Agenda, November 21 - November 27, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, November 22)
(Monday, November 22)
Line 2: Line 2:
  
 
= Monday, November 22 =
 
= Monday, November 22 =
 +
# Run update:
 +
## Magnet Update
 
# [https://halldweb.jlab.org/SRC/production_2021 Accumulated statistics over SRC run] (Sasha)
 
# [https://halldweb.jlab.org/SRC/production_2021 Accumulated statistics over SRC run] (Sasha)
 
# [https://halldweb.jlab.org/wiki/index.php/Run_Planning_Meeting_Notes,_November_18_-_November_24,_2021 Run conditions] (Sasha)
 
# [https://halldweb.jlab.org/wiki/index.php/Run_Planning_Meeting_Notes,_November_18_-_November_24,_2021 Run conditions] (Sasha)

Revision as of 13:07, 22 November 2021

Daily Analysis meeting at 2pm EST (CC room 326) BlueJeans Link

Monday, November 22

  1. Run update:
    1. Magnet Update
  2. Accumulated statistics over SRC run (Sasha)
  3. Run conditions (Sasha)
  4. Status of the run (Bo)
    1. Run 90034 (Nov 8 22:35) to Run 90232 (Nov 22 09:16)
    2. In total: 199 runs, 323 hours
    3. Production: 157 runs, 234 hours, 17888 EVIO files, 30.2B triggers
    4. Data quality checked until run 90223
    5. Physics analyzed until run 90135, 1288 EVIO files?
    6. Calibration: tagger microscope calibrated until 90200
  5. Detector Performance and Calibrations (Sasha)
    1. Initial settings in CCDB
  6. Rho minus meson cross sections (Axel)
  7. Rho Minus Channel Update (Jackson)
  8. Rho 0 Chanel update (Nathaly)
  9. Pi Minus Channel Update (Phoebe)
  10. Remaining Empty Shifts [1]
    1. Proposal