Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
(Shift Schedule)
Line 1: Line 1:
 
=== Shift Schedule ===
 
=== Shift Schedule ===
* [XXXX Link to shift schedule]
+
* [https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Link to shift schedule]
 
* Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely.  
 
* Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely.  
* A remote connection is available on zoom at all times:  
+
* A remote connection is available on zoom at all times:
 
+
  
 
=== Shift Tasks ===
 
=== Shift Tasks ===

Revision as of 11:56, 28 September 2021

Shift Schedule

  • Link to shift schedule
  • Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely.
  • A remote connection is available on zoom at all times:

Shift Tasks

  • [XXX Fill out the run spreadsheet.]
  • [XXXX Check and report on the key plots.]