Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
(List of good production runs)
Line 23: Line 23:
  
 
=== List of good production runs ===
 
=== List of good production runs ===
:[[ 2021/11 ]]
+
:[[ 2021-11 ]]

Revision as of 16:34, 9 November 2021

Shift Schedule

  • Link to shift schedule
  • Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
  • Responsible for checking data coming in from processing and ensuring run spreadsheet is maintained during the 12 hour shift.
  • CC Room 306 is ours to use throughout the experiment for collaboration and work.
  • Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171


  • Update and verify the run spreadsheet.
  • Ensure data quality run-by-run Document here
  • Looking at monitoring channels and physics by run on data from batch farm. Good plots to compare with are here.
  • Check plots here
  • Monitoring Launch Checks: individuals contact subsystem expert for any issues: subsystem teams
  • Update the run spreadsheet
  • Updates to daily analysis meeting
  • Keep count of events on target - add script details here

Summary Physics Shift Analysis

List of good production runs

2021-11