Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
Line 24: Line 24:
 
=== Some run information ===
 
=== Some run information ===
 
:[[ List of good production runs ]]
 
:[[ List of good production runs ]]
:[[ List of trigger configurations ]]
+
*Trigger Configurations
 +
**FCAL_BCAL_PS_SRC_m9.conf
 +
***"Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
 +
***Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
 +
***Bit 3: PS"

Revision as of 16:41, 9 November 2021

Shift Schedule

  • Link to shift schedule
  • Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
  • Responsible for checking data coming in from processing and ensuring run spreadsheet is maintained during the 12 hour shift.
  • CC Room 306 is ours to use throughout the experiment for collaboration and work.
  • Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171


  • Update and verify the run spreadsheet.
  • Ensure data quality run-by-run Document here
  • Looking at monitoring channels and physics by run on data from batch farm. Good plots to compare with are here.
  • Check plots here
  • Monitoring Launch Checks: individuals contact subsystem expert for any issues: subsystem teams
  • Update the run spreadsheet
  • Updates to daily analysis meeting
  • Keep count of events on target - add script details here

Summary Physics Shift Analysis

Some run information

List of good production runs
  • Trigger Configurations
    • FCAL_BCAL_PS_SRC_m9.conf
      • "Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
      • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
      • Bit 3: PS"