Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
Line 22: Line 22:
 
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis]
 
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis]
  
=== Some run information ===
+
=== List of good production runs ===
:[[ List of good production runs ]]
+
=== List of trigger configurations ===
*Trigger Configurations
+
*FCAL_BCAL_PS_SRC_m9.conf
**FCAL_BCAL_PS_SRC_m9.conf
+
**Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
***Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
+
**Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
***Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
+
**Bit 3: PS
***Bit 3: PS
+

Revision as of 17:37, 9 November 2021

Shift Schedule

  • Link to shift schedule
  • Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
  • Responsible for checking data coming in from processing and ensuring run spreadsheet is maintained during the 12 hour shift.
  • CC Room 306 is ours to use throughout the experiment for collaboration and work.
  • Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171


  • Update and verify the run spreadsheet.
  • Ensure data quality run-by-run Document here
  • Looking at monitoring channels and physics by run on data from batch farm. Good plots to compare with are here.
  • Check plots here
  • Monitoring Launch Checks: individuals contact subsystem expert for any issues: subsystem teams
  • Update the run spreadsheet
  • Updates to daily analysis meeting
  • Keep count of events on target - add script details here

Summary Physics Shift Analysis

List of good production runs

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS