Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
=== Analysis Shift Schedule ===
+
=== Analysis Shift ===
* [https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Link to analysis shift schedule]
+
* Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
+
* Responsible for checking data coming in from monitoring [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html plot browser] and ensuring work shift run spreadsheet [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?pli=1#gid=0 here] is maintained during the 12 hour shift.
+
* CC Room 306 is ours to use throughout the experiment for collaboration and work.
+
* Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
+
  
Tasks of Analysis Shift Work:
+
CC Room 306 is ours to use throughout the experiment for collaboration and work.
 +
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
  
 +
[https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]
 +
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
 +
* Responsible for:
 +
**checking data coming in from monitoring ([https://halldweb.jlab.org/data_monitoring/Plot_Browser.html plot browser]), and
 +
**ensuring [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?pli=1#gid=0 work shift run spreadsheet] is maintained during the 12 hour shift.
 +
 +
Tasks of Analysis Shift Work:
  
 
* [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?usp=sharing Update and verify the run spreadsheet.]  
 
* [https://docs.google.com/spreadsheets/d/19QWkjAPEiSd2scvAllYvgvB_puxKjFiSlh3z6EBfFck/edit?usp=sharing Update and verify the run spreadsheet.]  

Revision as of 14:42, 10 November 2021

Analysis Shift

CC Room 306 is ours to use throughout the experiment for collaboration and work. Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171

Sign Up for Analysis Shifts Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.

Tasks of Analysis Shift Work:

  • Update and verify the run spreadsheet.
  • Ensure data quality run-by-run Document here
  • Looking at monitoring channels and physics by run on data from batch farm. Good plots to compare with are here.
  • Check plots here
  • Monitoring Launch Checks: individuals contact subsystem expert for any issues: subsystem teams
  • Update the run spreadsheet
  • Updates to daily analysis meeting
  • Keep count of events on target - add script details here

Summary Physics Shift Analysis

List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS