Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
*Contacting the [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Calibrations appropriate team member] if there is a concern with a specific monitoring plot,
 
*Contacting the [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Calibrations appropriate team member] if there is a concern with a specific monitoring plot,
 
** Contact the counting house ( (757)269-5504) )
 
** Contact the counting house ( (757)269-5504) )
** Update daily analysis meeting with production runs.
+
* Update daily analysis meeting with production runs,
 +
* Update list of production runs at the bottom of this page.
  
 
<br>CC Room 306 is ours to use throughout the experiment for collaboration and work.
 
<br>CC Room 306 is ours to use throughout the experiment for collaboration and work.
Line 19: Line 20:
 
=== Physics Shift ===
 
=== Physics Shift ===
 
(Will be merged with Analysis Shift)
 
(Will be merged with Analysis Shift)
Responsible for:
+
Responsible for Running Physics Plugins
* Running
+
*ρ<sup>-
 +
**On the ifarm:
 +
*** cd /work/halld2/home/src-ct/HallD_SRC-CT_Analysis/analysis_scripts/proton_rhoMinus/
 +
*** ./offline_monitoring "Run Number"
 +
*** cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/
 +
proton_rhoMinus/
 +
*** cat counts_081474.txt
 +
** Input that into [https://docs.google.com/spreadsheets/d/1Jjw8vqd3jkP7ylnIn036v5qiaaHarswZzuCZKpBwLO8/edit#gid=0&range=T2 this spreadsheet]
 +
*ρ<sup>0
  
=== Summary Physics Shift Analysis ===
+
 
 +
Presentations on
 
*[https://halldweb.jlab.org/wiki/images/3/3d/Proton-rhoMinus_Analysis_Channel.pdf (γ,ρ<sup>-</sup>p) Channel Analysis]
 
*[https://halldweb.jlab.org/wiki/images/3/3d/Proton-rhoMinus_Analysis_Channel.pdf (γ,ρ<sup>-</sup>p) Channel Analysis]
 
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis]
 
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis]

Revision as of 19:13, 10 November 2021

Analysis Shift

Sign Up for Analysis Shifts
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join here).


Responsible for:


CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171

Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins

  • ρ-
    • On the ifarm:
      • cd /work/halld2/home/src-ct/HallD_SRC-CT_Analysis/analysis_scripts/proton_rhoMinus/
      • ./offline_monitoring "Run Number"
      • cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/

proton_rhoMinus/


Presentations on

List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS