Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
Line 25: Line 25:
 
*** cd /work/halld2/home/src-ct/HallD_SRC-CT_Analysis/analysis_scripts/proton_rhoMinus/
 
*** cd /work/halld2/home/src-ct/HallD_SRC-CT_Analysis/analysis_scripts/proton_rhoMinus/
 
*** ./offline_monitoring "Run Number"
 
*** ./offline_monitoring "Run Number"
*** cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/
+
*** cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/proton_rhoMinus/
proton_rhoMinus/
+
 
*** cat counts_081474.txt
 
*** cat counts_081474.txt
 
** Input that into [https://docs.google.com/spreadsheets/d/1Jjw8vqd3jkP7ylnIn036v5qiaaHarswZzuCZKpBwLO8/edit#gid=0&range=T2 this spreadsheet]
 
** Input that into [https://docs.google.com/spreadsheets/d/1Jjw8vqd3jkP7ylnIn036v5qiaaHarswZzuCZKpBwLO8/edit#gid=0&range=T2 this spreadsheet]

Revision as of 19:14, 10 November 2021

Analysis Shift

Sign Up for Analysis Shifts
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join here).


Responsible for:


CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171

Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins


List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS