Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
=== Analysis Shift ===
 
=== Analysis Shift ===
 +
 +
Note:
 +
 +
<br>CC Room 306 is ours to use throughout the experiment for collaboration and work.
 +
<br>Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
 +
  
 
[https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]
 
[https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]
Line 15: Line 21:
 
* Update list of production runs at the bottom of this page.
 
* Update list of production runs at the bottom of this page.
  
<br>CC Room 306 is ours to use throughout the experiment for collaboration and work.
 
<br>Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
 
  
 
=== Physics Shift ===
 
=== Physics Shift ===

Revision as of 19:14, 10 November 2021

Analysis Shift

Note:


CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171


Sign Up for Analysis Shifts
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join here).


Responsible for:


Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins


List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS