Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
  
 
Note:
 
Note:
<br>CC Room 306 is ours to use throughout the experiment for collaboration and work.
+
<br>People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
 
<br>Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
 
<br>Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
  

Revision as of 20:28, 10 November 2021

Note:
People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171


Sign Up for Analysis Shifts
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House (join here).


Responsible for:

  • Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
  • Completing data quality run-by-run,
    • SRC-CT specific plots to compare with are: TBD
    • General good plots to compare with are: here or here.
  • Checking data coming in from monitoring (plot browser),
  • Contacting the appropriate team member if there is a concern with a specific monitoring plot,
    • Contact the counting house ( (757)269-5504) )
  • Update daily analysis meeting with production runs,
  • Update list of production runs at the bottom of this page.


Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins


List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS