Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
(List of good production runs)
Line 33: Line 33:
 
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis]
 
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis]
  
 +
=== Calibration ===
  
  

Revision as of 06:47, 11 November 2021

Note:
People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
HallD Counting House (join here)


Sign Up for Analysis Shifts


Responsible for:

  • Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
  • Completing data quality run-by-run,
    • SRC-CT specific plots to compare with are: TBD
    • General good plots to compare with are: here or here.
  • Checking data coming in from monitoring (plot browser),
  • Contacting the appropriate team member if there is a concern with a specific monitoring plot,
    • Contact the counting house ( (757)269-5504) )
  • Update daily analysis meeting with production runs,
  • Update list of production runs at the bottom of this page.


Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins

Calibration

List of good production runs

  • updated until: 90064
  • By radiator:
    • amorphous radiator: 90034-90039, 90045, 90062
    • diamond radiator: 90051, 90059, 90061, 90063-90064

NOTES TO SOLVE (to be edited as they are solved):

  • Igal informed (11/11/2021 05:44) that run 90039 is not in the database. (CA)

List of trigger configurations

  • FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
    • Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
    • Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
    • Bit 3: PS