Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
(Trigger types)
 
(28 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 +
=== Experimental Details ===
 +
 +
[https://halldweb.jlab.org/wiki/index.php/Run_Wiki Run Wiki] <br>
 +
[https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Run Plan] <br>
 +
[https://halldweb.jlab.org/wiki/index.php/SRC@GlueX#Useful_Links Useful Links]<br>
 +
[https://halldweb.jlab.org/wiki/index.php/SRC@GlueX SRC@GlueX page]<br>
 +
[https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLD-SRCCT Shift Schedule]
 +
  
 
Note:
 
Note:
 
<br>People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
 
<br>People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
<br>Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
+
<br>Daily Analysis meeting at 9:15 am EST M-W-F (Hall D CH): https://bluejeans.com/773909590/1171
 +
** [[Analysis Shift Meeting Agenda, November 07 - November 13, 2021]]
 +
** [[Analysis Shift Meeting Agenda, November 14 - November 20, 2021]]
 +
** [[Analysis Shift Meeting Agenda, November 21 - November 27, 2021]]
 +
** [[Analysis Shift Meeting Agenda, November 28 - December 04, 2021]]
 +
** [[Analysis Shift Meeting Agenda, December 05 - December 11, 2021]]
 +
** [[Analysis Shift Meeting Agenda, December 12 - December 18, 2021]]
 +
** [[Analysis Shift Meeting Agenda, December 19 - December 21, 2021]]
 
<br> HallD Counting House (join [https://bluejeans.com/348194990/1111 here])
 
<br> HallD Counting House (join [https://bluejeans.com/348194990/1111 here])
  
 
+
=== [https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]===
[https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts]
+
  
 
<br> Responsible for:  
 
<br> Responsible for:  
Line 21: Line 35:
  
 
=== Calibration ===
 
=== Calibration ===
 
+
*[https://docs.google.com/spreadsheets/d/1AS6zaSNCUEi_nSQY4ngMsSjPRwdkgJYFfKuGQbqbFx8/edit?usp=sharing Calibration spreadsheet]
* [[FCAL time/energy calibrations]]
+
* [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Calibrations Team Calibration Assignments and Notes]
 +
* [[SRC FCAL time/energy calibrations]]
  
 
=== Physics Shift ===
 
=== Physics Shift ===
Line 33: Line 48:
 
*** cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/proton_rhoMinus/
 
*** cd /work/halld2/home/src-ct/offline_monitoring/RunPeriod-2021-08/ver01/proton_rhoMinus/
 
*** cat counts_081474.txt
 
*** cat counts_081474.txt
** Input that into [https://docs.google.com/spreadsheets/d/1Jjw8vqd3jkP7ylnIn036v5qiaaHarswZzuCZKpBwLO8/edit#gid=0&range=T2 this spreadsheet]
 
 
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis]
 
*[https://halldweb.jlab.org/wiki/images/e/e7/Rho0.pdf (γ,ρ<sup>0</sup>p) Channel Analysis]
 +
* [https://docs.google.com/spreadsheets/d/1s5l2EgSeTOqRaSqvdbCpysgxTtoJn14O3SD3ccpGAJ8/edit#gid=0 Current Data Spreadsheet]
 +
 +
=== Initial Flux Estimator ===
  
=== List of good production runs ===
+
/group/halld/Software/SRC/initial_flux
*updated until: 90064
+
*By radiator:
+
**amorphous radiator: 90034-90039, 90045, 90062
+
**diamond radiator: 90051, 90059, 90061, 90063-90064
+
  
<span style="color:red">'''NOTES TO SOLVE (to be edited as they are solved):'''</span>
 
* Igal informed (11/11/2021 05:44) that  run 90039 is not in the database accesible by the Python script. But it is in the RCDB. (CA)
 
  
=== List of trigger configurations ===
+
[[ Trigger Types ]]
*FCAL_BCAL_PS_SRC_m9.conf/FCAL_BCAL_PS_SRC_m10.conf (raw mode)
+
**Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
+
**Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
+
**Bit 3: PS
+

Latest revision as of 19:11, 28 February 2022

Experimental Details

Run Wiki
Run Plan
Useful Links
SRC@GlueX page
Shift Schedule


Note:
People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
Daily Analysis meeting at 9:15 am EST M-W-F (Hall D CH): https://bluejeans.com/773909590/1171


HallD Counting House (join here)

Sign Up for Analysis Shifts


Responsible for:

  • Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
  • Completing data quality run-by-run,
    • SRC-CT specific plots to compare with are: here
    • General good plots to compare with are: here or here.
  • Checking data coming in from monitoring (plot browser),
  • Contacting the appropriate team member if there is a concern with a specific monitoring plot,
    • Contact the counting house ( (757)269-5504) )
  • Update daily analysis meeting with production runs,
  • Update list of production runs at the bottom of this page.

Calibration

Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins

Initial Flux Estimator

/group/halld/Software/SRC/initial_flux


Trigger Types