Difference between revisions of "Analysis shift"

From GlueXWiki
Jump to: navigation, search
(Calibration)
(Trigger types)
 
(4 intermediate revisions by the same user not shown)
Line 54: Line 54:
  
 
/group/halld/Software/SRC/initial_flux
 
/group/halld/Software/SRC/initial_flux
 +
 +
 +
[[ Trigger Types ]]

Latest revision as of 19:11, 28 February 2022

Experimental Details

Run Wiki
Run Plan
Useful Links
SRC@GlueX page
Shift Schedule


Note:
People onsite are welcome to use CC Room 306 throughout the experiment for collaboration and work.
Daily Analysis meeting at 9:15 am EST M-W-F (Hall D CH): https://bluejeans.com/773909590/1171


HallD Counting House (join here)

Sign Up for Analysis Shifts


Responsible for:

  • Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
  • Completing data quality run-by-run,
    • SRC-CT specific plots to compare with are: here
    • General good plots to compare with are: here or here.
  • Checking data coming in from monitoring (plot browser),
  • Contacting the appropriate team member if there is a concern with a specific monitoring plot,
    • Contact the counting house ( (757)269-5504) )
  • Update daily analysis meeting with production runs,
  • Update list of production runs at the bottom of this page.

Calibration

Physics Shift

(Will be merged with Analysis Shift) Responsible for Running Physics Plugins

Initial Flux Estimator

/group/halld/Software/SRC/initial_flux


Trigger Types