Difference between revisions of "Analysis shift"
From GlueXWiki
(Created page with "=== Shift Schedule === * [ Link to shift schedule] * Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely. * A remote connection is availa...") |
|||
Line 1: | Line 1: | ||
=== Shift Schedule === | === Shift Schedule === | ||
− | * [ Link to shift schedule] | + | * [XXXX Link to shift schedule] |
* Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely. | * Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely. | ||
* A remote connection is available on zoom at all times: | * A remote connection is available on zoom at all times: | ||
Line 7: | Line 7: | ||
=== Shift Tasks === | === Shift Tasks === | ||
− | * [ Fill out the run spreadsheet.] | + | * [XXX Fill out the run spreadsheet.] |
− | * [ Check and report on the key plots.] | + | * [XXXX Check and report on the key plots.] |
Revision as of 11:51, 28 September 2021
Shift Schedule
- [XXXX Link to shift schedule]
- Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely.
- A remote connection is available on zoom at all times:
Shift Tasks
- [XXX Fill out the run spreadsheet.]
- [XXXX Check and report on the key plots.]